(U)Innovative Naval Prototypes(INP) Applied Res
Abstract
Innovative Naval Prototypes (INP) investments are typically 4-8 years in duration. They provide a continuance of basic research by maturing technologies from a Technology Readiness Level (TRL) of 2 or 3 to a TRL of 6. It is intended that prototypes developed within this program, requiring both Budget Activity 2 (BA2) and Budget Activity 3 (BA3) funding, are demonstrated in a relevant environment to prove the feasibility of the new technological capability. The portfolio is periodically refreshed through the selection of new INPs as existing ones are completed. Successful experiments and demonstrations are intended to present the Department of the Navy with a programmatic challenge as these new capabilities can lead to the obsolescence of existing capabilities, requiring significant decisions as to the path forward for integrating the new technological capabilities into the warfighting systems of the future. INPs have been collectively grouped into R-2 Activities that include Unmanned and Autonomous Systems, Directed Energy/Electric Weapons, Electromagnetic Maneuver Warfare, Cyber, Undersea Warfare and Artificial Intelligence. Due to the nature of these projects, technology development plans have been written with limited details due to information security concerns. Specific information on each project will be provided separately to the Congressional oversight committees.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2020
- Source ID
- 0000_0602792N_2_1319_PB_2020
Related Documents
- Root: (U)Innovative Naval Prototypes(INP) Applied Res
- Child Accomplishment: Cyber
- Child Accomplishment: Directed Energy / Electric Weapons
- Child Accomplishment: Electromagnetic Maneuver Warfare
- Child Accomplishment: INP Management
- Child Accomplishment: Undersea Warfare
- Child Accomplishment: Unmanned and Autonomous Systems
- Child Accomplishment: Artificial Intelligence