B-1B SQUADRONS

Abstract

This program provides RDT&E AF funding for the B-1B modernization program. The modernization program addresses potential aircraft grounding issues and provides new and improved capabilities to the B-1B weapon system that require significant hardware and software development and testing. In addition, the modernization program addresses reliability and Diminishing Manufacturing Sources (DMS) deficiencies to prevent future grounding of B-1B aircraft. B-1B grounding items are addressed in the following efforts: Central Integrated Test System (CITS) upgrade, Radar Reliability and Maintainability Improvement Program (RMIP), Vertical Situational Display Upgrade (VSDU), and Inertial Navigation System (INS) upgrade. B-1B improvement efforts include, but are not limited to, the development of the Fully Integrated Data Link (FIDL), ALQ-161A Preprocessor Avionics Control Unit (PACU) software re-host/development, and Active Electronically Scanned Array (AESA) Radar study. FIDL integrates Link-16 and Beyond Line of Sight (BLOS) data links along with upgraded displays for improved connectivity to command and control authorities and for enhancements to targeting and weapons management. Upgrades to the B-1B training systems are included in the modernization program to keep the training systems current with the aircraft configuration. In addition, program funds cover engineering/planning studies, related engineering efforts, and initiatives for future weapon system enhancements, including efforts to improve weapon system operational capabilities, safety, supportability, maintainability, reliability, and total ownership cost. All B-1B development programs support planned requirements for unique identification in their production phases. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2012
Source ID
0101126F_7_3600_PB_2012
Change Summary Explanation
FY 2012: Program increased by $26.738M to support continued development of Vertical Situational Display Unit (VSDU) and other B-1B Modernization development efforts.
Service Agency Name
Air Force

Entities

Organizations

  • United States Air Force

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircrafts
  • Contracts
  • Cost Analysis
  • Costs
  • Data Links
  • Electronically Scanned Array
  • Engineering
  • Flight Testing
  • Inertial Navigation
  • Inertial Navigation Systems
  • Line Of Sight
  • Maintainability
  • Navigation
  • Production
  • Radar
  • Test And Evaluation
  • Weapon Systems

Fields of Study

  • Engineering

Readers

  • Aerospace Engineering

Technology Areas

  • Directed Energy
  • Fully Networked C3
  • Fully Networked C3 - Command and Control
  • Microelectronics

Related Documents