ICBM Reentry Vehicles

Abstract

The Intercontinental Ballistic Missile (ICBM) Reentry Vehicles (RVs) activity will design, develop, produce, and deploy integrated RV systems capable of delivering the W87-1 warhead and future warheads when released from the Sentinel (GBSD) weapon system. The Mk21A program will meet the requirements laid out in the Sentinel (GBSD) weapon system Capability Development Document (CDD) as directed by Air Force Global Strike Command, and will provide needed performance and security enhancements over the Mk21 RV to meet the upgraded requirements for the Department of Energy W87-1 warhead. The Mk21A RV includes: shape stable nose tip; high impulse transducer; arming and fuzing system (AFS); aeroshell forward section, body section, and rear cover; radio frequency subsystem with antennas; RV spin-up system; in-flight disconnect cable; and other electrical cables. The Next Generation Reentry Vehicle (NGRV) program will ensure the Sentinel (GBSD) weapon system continues to meet CDD requirements in an evolving threat landscape by leveraging advanced capabilities matured by the Research & Development (R&D) and ICBM Demonstration/Validation communities in support of the Air Force's Reentry Vehicle Strategy. Future NGRV solutions will integrate with current and/or future warheads and will include acquisition of complementary countermeasures, embracing the modular and adaptable tenets of the Sentinel (GBSD) weapon system. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such programs funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY2022 $934K was expended for civilian pay expenses in this program element, and in FY2023 $0 is forecasted for civilian pay expenses in this program element. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2024
Source ID
0101328F_7_3600_PB_2024
Change Summary Explanation
FY22 budget increased from FY23 PB due to a $7.499M reprogramming from ICBM Fuze Modernization (PE 0604933F) to support additional risk reduction activities on the Mk21A TMRR contract. FY23 budget decreased from FY23 PB due to a $3M Congressional Mark citing excess to need. FY24 budget increased from the FY23 PB based on several factors. First Mk21A's recent cost estimates refined the Sentinel integration costs. Specifically, the cost increase is attributed to changes needed to the Payload Reentry System requirements (+$43.4M). Secondly, Mk21A added another fight test due to the anomalous flight test in July 2022 (+$48M). Lastly, NGRV funding was accelerated to begin early acquisition activities in FY 2024 (+$15.5M).
Service Agency Name
Air Force

Entities

Organizations

  • United States Air Force

Tags

Communities of Interest

  • Counter WMD (Alumni COI)
  • Cyber
  • Kinetic Weapons

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Ballistic Missiles
  • Cost Analysis
  • Data Management
  • Digital Engineering
  • Engineering
  • Ground Based
  • Information Systems
  • Intercontinental Ballistic Missiles
  • Manufacturing
  • Open System Architecture
  • Program Management
  • Radio Frequency
  • Systems Engineering
  • Test And Evaluation
  • Weapon Systems

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Electrical Engineering
  • Missile Defense Systems.

Related Documents