Navy Strategic Comms
Abstract
The E-6B Block I modification program corrects Airborne National Command Post program Follow-On Operational Test and Evaluation operational suitability deficiencies and addresses legacy system obsolescence issues. Without the Block I program, legacy system obsolescence will result in several unsupportable mission systems by 2010. Block I designs, develops, integrates, and tests a Multi-Level Security system, Open Systems Architecture; replaces the intercommunications and Mission Computer Set; modifies the cooling, electrical, and Ultra-High Frequency Command, Control and Communications system; and addresses Internet Protocol Bandwidth Expansion impacts to pre-Block I baseline aircraft. Block I adds operator workstations throughout the aircraft to reduce workload and improve system interoperability, and provides a foundation for evolutionary upgrades. Other modifications (Block IA) include: an additional Auxiliary Power Unit to enhance power and cooling capabilities supporting the additional systems in the Multi-Level Security system, Open Systems Architecture, a Very Low Frequency Transmitter obsolescence replacement, and a High Power Transmit Set subsystem refurbishment.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2011
- Source ID
- 0101402N_7_1319_PB_2011
- Change Summary Explanation
- Schedule: (3002) Schedule for the Block IA Engineering Change Proposal (ECP) development has been delayed by six months, from 2nd quarter FY09 to 1st quarter FY10, because of technical challenges in the Block IA contract award. Technical: Not applicable. FY11 from previous President's Budget is shown as zero because no FY11-15 data was presented in President's Budget 2010.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Navy Strategic Comm Project
- Child Accomplishment: Conduct DT Governmental Training
- Child Accomplishment: Conduct DT Support Training
- Child Accomplishment: Prototype Aircraft Installation
- Child Accomplishment: Developmental/Operational Testing
- Child Cost Item: a1519dec395c1326786515566f0b8da1
- Child Cost Item: 6da13309ab8b20249b7d15853f90218e
- Child Cost Item: b1ab862ebc0afd39529bd3cbbaf6b695
- Child Cost Item: ceba26c44b665557576cd2583e851854
- Child Cost Item: 3788ecdf7d54926fb7f363a2c5ad3a9a
- Child Cost Item: df53f994d3cecb6136ede4d4429005e2
- Child Cost Item: 00883afcbd17b854d71cf8be5f43e9aa
- Child Cost Item: 27ba1541efe72507c0552cb784b19299
- Child Cost Item: 5b4714b7bd14cc833dafe35f65431ad7
- Child Cost Item: c0626c9d6c73f7315ea03716254c48ea
- Child Cost Item: 4e66f1f0b4ac66d67a841db449e2c9a8
- Child Cost Item: c1b8fab813d4b62d296526704302cd57
- Child Cost Item: 160d77a1839f73dc68d582b386f052fd
- Child Project: Congressional Adds