Production Readiness
Abstract
USD(AT&L) approved the first phase of a two-phased GPS III SV acquisition strategy starting no earlier than SV11. The strategy utilizes FY15-17 RDTE funding for the Phase 1 effort to mature up to three contractors' GPS III production designs. The Phase 1 Production Readiness Feasibility Assessment will provide data and insight into contractors GPS III Production Design with emphasis on a mature navigation payload that includes a regional M-Code capability that is consistent with the GPS Enterprise analysis of alternatives. Phase 1 requires contractors to provide a GPS III space vehicle and navigation payload production designs, manufacturing plans, and a navigation payload engineering brass board (hardware).