Tomahawk Mssn Planning Ctr

Abstract

Funds support development of the Tomahawk Weapon System (TWS) encompassing Tomahawk Land-Attack Missile (TLAM) upgrades, initiation of baseline improvements into the Block IV weapon system, Tactical Tomahawk Weapons Controls System (TTWCS), Tomahawk Mission Planning Center (TMPC) upgrades and other missile system improvements to maintain pace with threats. The TWS provides a Tomahawk cruise missile attack capability against fixed and mobile targets. Tomahawk is capable of being deployed from both submarines and surface ships. Launched from mobile, sea-based platforms, the land attack variant significantly increases the total capability of joint forces. This Program Element also includes initial funding for the NGLAW Capabilities Based Assessment(CBA) and Analysis of Alternatives (AoA) preparations. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under Operational Systems Development because it includes development efforts to upgrade systems that have been fielded or have received approval for Full Rate Production (FRP) and anticipate funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2017
Source ID
0204229N_7_1319_PB_2017
Change Summary Explanation
Decrease in Tomahawk Mission Planning Center by $1.49M as required for the Department of the Navy to comply with the Bipartisan Budget Act of 2015. Technical: FY17 increase in funding will be used to continue Anti-Access/Area Denial (A2AD) navigation improvements and A2AD communication upgrade baseline improvements as well as incorporate an all-weather seeker into the Block IV Tomahawk Weapon System as part of the recertification of the Tactical Tomahawk (TACTOM). Schedule: PU-0545 A2AD OTRR moved from 4Q FY18 to 4Q FY19 due to further requirements definition of the Tomahawk Weapon System (TWS) as a part of the System Engineering Technical Review (SETR) process and refinement of the Modernization Integrated Master Schedule (IMS). PU-0545 Added A2AD Interim Program Review 1 (IPR1) to 3Q FY16, A2AD IPR2 to 3Q FY17, A2AD IPR3 to 3Q FY18 as a part of the System Engineering Technical Review (SETR) process and refinement of the Modernization Integrated Master Schedule (IMS). PU-0545 Added A2AD MOD Blk IV Fleet Release to 4Q FY20 PU-0545 Added TMPC 5.0.2 to 4Q FY17 to reflect Geospatial-Intelligence Agency (NGA) imagery format changes. PU-0545 Added Seeker TTWCS Development to schedule 1Q FY17 through 4Q FY18 due to the requirement to incorporate an all weather multi-mode seeker into the Block IV Tomahawk weapon system to be incorporated as part of the recertification of the Tactical Tomahawk (TACTOM). PU-0545 Added Seeker TMPC Development to schedule 1Q FY17 through 4Q FY18 due to the requirement to incorporate an all weather multi-mode seeker into the Block IV Tomahawk weapon system to be incorporated as part of the recertification of the Tactical Tomahawk (TACTOM). PU-0545 Added Seeker AUR Development to schedule 2Q FY17 through 1Q FY20 due to the requirement to incorporate an all weather multi-mode seeker into the Block IV Tomahawk weapon system to be incorporated as part of the recertification of the Tactical Tomahawk (TACTOM). PU-0545 Added Seeker HWIL/LAB/Integration Testing to schedule 2Q FY17 through 4Q FY20 due to the requirement to incorporate an all weather multi-mode seeker into the Block IV Tomahawk weapon system to be incorporated as part of the recertification of the Tactical Tomahawk (TACTOM). PU-0545 Added Seeker System Test to schedule 2Q FY20 through 4Q FY21 due to the requirement to incorporate an all weather multi-mode seeker into the Block IV Tomahawk weapon system to be incorporated as part of the recertification of the Tactical Tomahawk (TACTOM). PU-0545 A2AD NAV moved from 1Q FY2015-4Q FY15 to 1Q FY15 to 4Q FY17 as a part of the System Engineering Technical Review (SETR) process and refinement of the Modernization Integrated Master Schedule (IMS). PU-0545 A2AD (NAV/COMMS) ECPs moved from 1Q FY2015-4Q FY2017 to 1Q FY2015 - 2Q FY2019 as a part of the System Engineering Technical Review (SETR) process and refinement of the Modernization Integrated Master Schedule (IMS). PU-0545 A2AD SRR moved from 2Q FY15 to 3Q FY15 to reflect actual date of completion. PU 3378- Removed FY16-FY20 schedule due to Next Generation Land Attack Weapon moving from Program Element 0204229N (Tomahawk Mission Planning Center) to 0604659N (Precision Strike Weapons Development Program. PU 3378 - Changed AoA Preps to Initial Capabilities Document (ICD) Staffing to accurately reflect pre-AoA activities.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Command And Control
  • Command And Control Systems
  • Contingency Operations (Military)
  • Contracts
  • Control Systems
  • Cost Analysis
  • Cruise Missiles
  • Engineering
  • Global Positioning Systems
  • Land Attack Missiles
  • Navigation
  • Radio Equipment
  • Software Development
  • Systems Engineering
  • Test And Evaluation
  • Weapon Systems

Readers

  • Naval Mine Countermeasure Systems Development.

Related Documents