Tomahawk Mssn Planning Ctr

Abstract

Funds support development of the Tomahawk Weapons System (TWS) encompassing Tactical Tomahawk upgrades including baseline improvements into the Block V missile All-Up Round (AUR), Tactical Tomahawk Weapons Controls System (TTWCS), Theater Mission Planning Center (TMPC) upgrades and other missile system improvements to maintain pace with threats. The TWS provides a long range cruise missile attack capability against fixed and mobile targets. Tomahawk is capable of being deployed from both submarines and surface ships and significantly increases the total capability of joint forces. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under Operational Systems Development because it includes development efforts to upgrade systems that have been fielded or have received approval for Full Rate Production (FRP) and anticipate funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2023
Source ID
0204229N_7_1319_PB_2023
Change Summary Explanation
Financial: The FY 2021 budget decreased by $6.355M from the enacted budget due to mandatory SBIR transfers. Technical: Not applicable Schedule: PU 4032: N/A PU 4033: N/A PU 4034: MST Seeker Kit LRP 1 Contract Award from 3Q 2021 TO 1Q 2022 Recert Contract Modification to Install SKR Kit updated from 2Q 2022 TO 3Q 2023 MST Seeker Kit LRP 2 Contract Award updated from 1Q 2022 TO 2Q 2022 Missile Level Qual Testing start updated from 2Q 2022 TO 4Q 2022 SW & Sim Dev & Test start updated from 1Q 2020 TO 1Q 2021 Combined Inc 1 Segment Test and FB Development and Segments Tests and changed name to Inc/FB Development and Segment Tests and updated start to 2Q 2022. Seeker EDM Deliveries start updated from 4Q 2020 TO 1Q 2021 LRP 1 Seeker Del updated from 4Q 2022 TO 1Q 2024 PU 4035: N/A PU 4036: TTWCS v5.6 Modernized Missile DT/OT removed due to completion TMPC v8.0 renamed to TMPC v8.0(JMEWS) TMPC v8.0(JMEWS) Requirements Definition moved from 1Q 2020 - 4Q 2021 to 1Q 2021 - 4Q 2022 TMPC v8.0(JMEWS) Software Development & Integration start moved from 1Q 2022 to 1Q 2023 TTWCS v5.6.0 renamed to v5.6.0.X TTWCS v5.6.1 renamed to v5.6.1.X TTWCS v5.7 renamed to TTWCS v7.X TTWCS v7.X (previously v5.7) Candidate Development renamed to TTWCS v7.X Design TACTOM Preplanned Product Improvement (P3I) renamed to TACTOM Preplanned Product Improvement (P3I) / Cyber Improvements TTWCS v5.6.1.X DT/OT start moved from 4Q FY2022 to 1Q FY2022 TTWCS v7.X (previously v5.7) SW Dev & Integration start moved from 1Q FY2022 to 4Q FY2022 TACTOM Preplanned Product Improvement (P3I) / Cyber Improvements start moved from 1Q FY2020 to 1Q FY2023 --- FY 2023 funding increase reflects the fact that the FY 2022 President’s Budget request did not include out-year funding.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Counter WMD
  • Cyber
  • Space

DTIC Thesaurus Topics

  • Application-Specific Integrated Circuits
  • Command And Control
  • Command And Control Systems
  • Contingency Operations (Military)
  • Control Systems
  • Cruise Missiles
  • Cyber Threats
  • Defense Systems
  • Department Of Defense
  • Global Positioning Systems
  • Insensitive Explosives
  • Navigation
  • Procurement
  • Product Development
  • Software Development
  • Systems Engineering
  • Test And Evaluation

Readers

  • Naval Mine Countermeasure Systems Development.

Related Documents