Tomahawk Mssn Planning Ctr

Abstract

Funds support development of the Tomahawk Weapons System (TWS) encompassing Tactical Tomahawk upgrades including baseline improvements into the Block V missile All-Up Round (AUR), Tactical Tomahawk Weapons Controls System (TTWCS), Theater Mission Planning Center (TMPC) upgrades and other missile system improvements to maintain pace with threats. The TWS provides a long range cruise missile attack capability against fixed, mobile, and maritime targets. Tomahawk is capable of being deployed from both submarines and surface ships and increases the total capability of joint forces. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under Operational Systems Development because it includes development efforts to upgrade systems that have been fielded or have received approval for Full Rate Production (FRP) and anticipate funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2025
Source ID
0204229N_7_1319_PB_2025
Change Summary Explanation
Financial: The FY 2025 increase of $40.69M is driven by an increase of $18.8M for JMEWS to continue the EMD and post Critical Design Review testing, an increase of $11.059M for M-Code to support cost increases, an increase of $12.351M for Efforts include increase in rotable pool recertifications, Thrust Vector Controller (TVC) redesign, Digital Imagery Exploitation Engine (DIEE) integration into TMPC software, Hardware in the Loop (HIL) obsolescence upgrades, and ISBS components redesign, and a decrease of $1.52M for minor economic adjustments for items such as civilian pay, inflation, and fuel pricing. Overall funding increase from FY 2024 to FY 2025 is driven by multiple factors. Increased FY 2025 funding for PU 0545 Tomahawk (+$35.8M) to begin Guidance Electronics Unit - Redesign effort in order to avoid a future break in Tomahawk production. Increased FY 2025 funding for PU 4032 NAV/COMMs (+$17.951M) for test platform equipment, capabilities development and integration testing. Increased FY 2025 funding to PU 4034 Maritime Strike (+$27.774M) due to contractor delays requiring a contract extension to finish software integration efforts and deliver initial capability to the fleet. Increased FY 2025 funding to PU 4035 JMEWS (+$6.340M) due to prior year testing results driving a need to continue EMD and post Critical Design Review testing in order to satisfy Insensitive Munitions (IM) requirements, Hazard Classification (HC) testing, fuse and warhead qualification, systems engineering reviews, Safety Review Board, and maintain Q4 FY 2027 Fleet Release. Schedule: PU 4033 M-Code: Increment I Fleet Release updated name to Initial Operating Capability (IOC) and date moved from 2Q FY 2026 to 1Q FY 2027. Milestone C moved from 2Q FY 2025 to 4Q FY 2025. IT-C moved from 4Q FY 2025- 2Q FY 2026 to 4Q FY 2025 - 1Q FY 2027. Added M-Code LRIP Contract Award. Changed M-Code FRP Lot-1 Contract Award from 2Q FY 2025 to 2Q FY 2026. Changed M-Code FRP Lot-2 Contract Award from 2Q FY 2026 to 2Q FY 2027. Changed M-Code FRP Lot-3 Contract Award from 2Q FY 2027 to 2Q FY 2028. Changed Test and Evaluation OT(v5.6.1) to FT(v5.6.1). Moved TTWCS v5.6.0/v5.6.1 Testing from 2Q FY 2025 - 3Q FY 2025 to 4Q FY 2025 - 2Q FY 2026. Moved Combat & Control Systems GTS Testing from 2Q FY 2025 - 4Q FY 2025 to 4Q FY 2025 - 1Q FY 2026. PU 4034 Maritime Strike: Milestone names updated to reflect MST transition from an RDC to an ACAT IC sub-program. IOC moved from 1Q FY 2025 to 4Q FY 2027. Added Early Operational Capability (EOC) in 4Q FY 2025. Added FRP-DR 4Q FY 2027. Added Deliveries for Software and Simulations. Added Integration. Removed Test & Evaluation and Reviews/CDR/Engineering/Dev. Moved LRP 1/2 deliveries from 1Q FY 2024 - 4Q 2024 to 3Q FY 2024 - 3Q FY 2025. Moved LRP 3 deliveries from 4Q FY 2024 - 4Q FY 2025 to 1Q FY 2025 - 1Q FY 2026. Moved LRP 4 deliveries from 4Q FY 2025 - 4Q FY 2026 to 4Q FY 2025 - 4Q FY 2026. Renamed LRP5 to Lot 5. Renamed FRP 1 to Lot 6 and moved deliveries from 4Q FY 2027 - 4Q FY 2028 to 1Q FY 2028 - 1Q FY 2029. Renamed FRP 2 to Lot 7 and moved deliveries from 4Q FY 2028 - 4Q FY 2028 to 1Q FY 2029 - 4Q FY 2029. Added TTWCS. PU 4035 JMEWS: TTWCS v7.x Development/Testing moved from 1Q FY 2023-4Q FY 2026 to 3Q FY 2023-2Q FY 2026. Moved Transition to Production from 2Q FY 2024-2Q FY 2025 to 1Q FY 2025-1Q FY 2026. Added Delta CDR 3Q FY 2024. Long Lead Energetics renamed LRIP Long Lead Energetics and moved from 1Q FY 2023-3Q FY 2024 to 3Q FY 2023-1Q FY 2025. Added FRP Long Lead Energetics. Contract Award Transition to Production (CA TTP) moved from 1Q FY 2025 to 2Q FY 2025. PRR moved from 1Q FY 2025 to 3Q FY 2025. Milestone C moved from 2Q FY 2025 to 3Q FY 2025. Added Delta Design Review 1Q FY 2024. PU 4036 TTWCS/TMPC: Added TMPC Preplanned Product Improvement 1Q FY 2025 - 4Q FY 2029 Added TMPC 7.X Product Acceptance Testing Land Attack (PAT) & DT/OT 1Q FY 2023 - 2Q FY 2024 TMPC 8.X SW Dev & Integration moved from 1Q FY 2023-2Q FY 2025 to 1Q FY 2023-2Q FY 2026 TMPC 7.X Product Acceptance Testing MST (PAT) & DT/OT moved from 3Q FY 2023-1Q FY 2025 to 3Q FY 2023-1Q FY 2026 TTWCS v5.6.1.X Fleet Release (MST) moved from 1Q FY 2025 to 3Q FY 2026
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Readers

  • Naval Mine Countermeasure Systems Development.

Related Documents