Consolidated Trng Sys Dev
Abstract
A. MISSION DESCRIPTION: 0604 - This project develops specialized instrumentations for fleet readiness training while minimizing life cycle costs. Tasks include development of the following: Large Area Training Range (LATR) improvements and Tactical Training Range(TTR) infrastructure improvements to include: the Joint Display Subsystem (JDS), Radar Acquistion Display Subsystem, Electronic Warfare (EW) server, Link 16 interface, TTR shipboard rotary platform technology improvements and the Radiant Mercury (RM) Cross Domain Solution (CDS). 1427 - Surface Tactical Team Trainer (STTT) develops modifications during sustainment of Battle Force Tactical Training (BFTT) system. This is required to maintain capabilities and interfaces to provide realistic combat system coordinated team, unit and Fleet Synthetic Training (FST) collective Group/Force level training events. In addition, BFTT supports the embedded trainer "family of systems" approach for the development of a Total Ship Training Capability (TSTC). Specific improvements include improved integration with the Navy Continuous Training Environment (NCTE) and development of a High Level Architecture (HLA) capable, integrated shipboard network to meet increasing Commander Naval Surface Forces (CNSF) and United States Fleet Forces Command (USFFC) FST requirements. The need for transforming training is documented within the DoD Training Transformation Plan, the Chief of Naval Operations Fleet Response Plan and Commander United States Fleet Forces Command Fleet Readiness Training Plan. 2124 - The Air Warfare Training Development (AWTD) program provides transition of operational systems technologies and risk mitigation for aviation training systems, including mission preview/rehearsal simulation technologies, Live-Virtual Constructive (LVC) and the Aviation Training Technology Integration Facility (ATTIF). The ATTIF provides for incremental development, prototype evaluation, technology readiness level assessment and final fleet Test and Evaluation prior to technology transition. 3093 - The Tactical Combat Training System (TCTS) will provide the Navy a replacement for the Tactical Aircrew Combat Training System and LATR systems. TCTS will also provide fleet deployable training for at-sea training and tactics development. By providing a rangeless capability, the system will greatly increase the area where live instrumented training can be conducted. Fielding of a pod system is complete at TACTS sites. The program incorporates an evolutionary development (incremental) towards an encrypted system capable of supporting a broad spectrum of naval platforms through weapons simulations, participant sensor stimulation, open architecture and an encrypted/long range secure data link. 3356- Funds FCA, high fidelity Aegis Integrated Air and Missile Defense (IAMD) individual and team trainers for all Advanced Capability Build (ACB) and below Aegis baselines. This line also provides funds for development of a CIWS 1B Baseline 2 Trainer upgrade. JUSTIFICATON FOR BUDGET ACTIVITY: This program is funded under Operational Systems Development because it includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate funding in the current or subsequent fiscal year.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2015
- Source ID
- 0204571N_7_1319_PB_2015
- Change Summary Explanation
- 0604: R-4/R-4A reflects the following program changes: LATR-OPSEC posture improvements Systems Development/Production Milestone ending 4th Qtr FY2014 vice 4th Qtr FY2013 due to added requirement of establishing a LATR baseline following a LATR technology refresh and required Acquisition documentation. LATR-Ship Rotary Platform Tracking set beginning 3rd Qtr FY2013 vice 1st Qtr FY2014 due to anticipated increase in time required for capability development. LATR EW interface development completed 4th Qtr FY2012 vice 1st Qtr FY2015 due to added resources in FY2012 to complete effort. TTR-Shipboard/Rotary Platform Tracking Set Systems Development/Production Milestone ending 4th Qtr FY2014 vice 1st Qtr FY2013 due to an extended review of requirements due to multiple end user inputs. 2124: R-4/R-4A reflects the following program changes: Human/Instructional Systems Integration-DMRT-Class Debrief APAARS Systems Development ending 4th Qtr FY2014 vice 2nd Qtr FY2012 due to an approved schedule change in the ONR Technology Transition Agreement (TTA) driven by changing fleet test dates. Human/Instructional Systems Integration-Hypoxia/Spatial Disorientation Technology (Fixed/Rotary) Systems Development/Production Milestone ending 4th Qtr FY2015 vice 4th Qtr FY2014 due to an added associated Spatial Disorientation syllabus review by the Navy. Sensors and Environment-Comms/EW Systems Development/Production Milestone ending 4th Qtr FY2019 vice 4th Qtr FY2017 due to a planned new application of the technology to the Unmanned Combat Air Vehicle effort during FY18. Training Common Architecture began 4th Qtr FY2012 ending 4th Qtr 2015 to reduce trainer costs by developing a common interface solution. 3093: R-4/R-4A reflects the following program changes: As a result of delays in developing an encryption solution and corresponding budget reductions, the following program changes occurred: TACTS/LATR Replacement-Acquisition Milestone Encryption MS B from 3th Qtr FY2012 to 4th Qtr FY2014. TACTS/LATR Replacement-Acquisition Milestone Encryption MS C from 4th Qtr FY2015 to 3th Qtr FY2017. TACTS/LATR Replacement-Production Milestone Increment 2 Encrypted Datalink Capability from 4th Qtr FY2015 to 4th Qtr FY2017.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Training Range & Instr Dev
- Child Accomplishment: LATR
- Child Accomplishment: TENA
- Child Accomplishment: TTR
- Child Project: Surface Tactical Team Trainer (STTT)
- Child Accomplishment: Surface Tactical Team Trainer (STTT)
- Child Project: Air Warfare Training
- Child Accomplishment: HUMAN/INSTRUCTIONAL SYSTEMS INTEGRATION
- Child Accomplishment: SENSORS AND ENVIRONMENT
- Child Accomplishment: SYSTEM ENGINEERING & INTEGRATION
- Child Accomplishment: LIVE VIRTUAL CONSTRUCTIVE (LVC) AND VISUALS
- Child Project: TACTS/LATR Replacement
- Child Accomplishment: TACTS/LATR REPLACEMENT
- Child Project: High Fidelity Surface Trainers
- Child Accomplishment: Combined IAMD ASW Trainer (CIAT)
- Child Accomplishment: CIWS 1B Baseline 2 Schoolhouse Integration