Abstract

0604 - Training Range and Instrumentation Development project develops specialized instrumentations for fleet readiness training while minimizing life cycle costs. Tasks include development of the following: Large Area Tracking Range (LATR) improvements, technology improvements for fixed and portable Anti-Submarine Warfare training ranges, and Tactical Training Range (TTR) infrastructure improvements to include: Joint Display Subsystem, Radar Acquisition Display Subsystem, Electronic Warfare server, Link 16 interface, TTR Rotary Wing Tracking System technology improvements, Radiant Mercury Cross Domain Solution and Smart Antenna technology for automated frequency deconfliction. FY18 to FY19 funding increase represents support to planned LATR, TTR and Ocean System development programs. It also includes increased funding of $.565M for Smart Antenna development. 1427 - Surface Tactical Team Trainer (STTT) develops modifications during sustainment of Battle Force Tactical Training (BFTT) system and modernization into the Advanced Training Domain (ATD). Both BFTT and ATD are the core system that is used to integrate the weapon system elements, and combat system components to create the Total Ship Training Capability (TSTC). BFTT and ATD continue to integrate and update, as new tactical capabilities are being introduced, to enable crew operator proficiency training for basic and sustainment level training events, through distributed strike group certification fleet synthetic training (FST) events and including COMPTUEX FST at Sea integration into Live, Virtual and Constructive (LVC) environment. Continued Development is required to integrate new capabilities and interfaces to provide training for AEGIS and SSDS combat system capability upgrades, and to address the Fleet's Live, Virtual and Constructive (LVC) Fleet Training Wholeness initiative. Additionally, modernization is needed to support the DoD Training Transformation Plan, the Chief of Naval Operations Fleet Response Plan. 2124 - Air Warfare Training Development (AWTD) provides for risk mitigation and next generation platform, Unmanned Aerial Systems (UAS), Live Virtual Constructive (LVC) and associated visualization component development for distributed mission training, and for stand-alone and small footprint deployable devices. Support the Navy Aviation Simulation Master Plan (NASMP) upgrade efforts and Type/Model/Series programs with advanced visual system display configurations requirements. Provide for Open Architecture (OA), and common systems interface applications. Assess trainee cognitive requirements and the development and incorporation of next generation LVC, UAS constructive and associated visualization component technologies. Additionally, AWTD provides for advanced virtual component fidelity improvements for LVC capability which includes the "Mobility" Part-Task Trainers and the Multiplex Data Bus Controller Translator Transmitter enabling technologies. LVC technologies will facilitate advanced, cost effective weapons and tactics training and emerging capability requirements in the Air-Sea Battle Space and Naval Integrated Fire Control-Counter Air capabilities development. 3093 - The Tactical Combat Training System (TCTS) Increment II will provide an improved environment for air combat training utilizing a secure air-to-air and air-to-ground data link, and will provide rangeless operation capability to Forward Deployed Naval Forces (FDNF). TCTS Increment II will provide encryption and an enhanced threat environment, as well as airborne participant instrumentation for multiple fixed and rotary wing platforms. Engineering Development Models (EDM) units procured in FY18 (41) and FY19 (16) will support Engineering and Developmental Testing events thru FY20. The EDMs will be specifically utilized for testing in the following areas: Environmental Qualification, Software, High Accelerated Lifecycle, Ground System Integration, Airborne Subsystem Air Worthiness and Performance, Shipboard Ground Station, Internal Mount and Rack Mounted Subsystem (Internal Mount) Airworthiness and Performance and JSF Airworthiness and Performance. FY19 funding supports both multiple government and contractor development efforts, as well as, procurement of the EDMs. These efforts support a Milestone C of 1Q FY20 and a Fleet IOC need date of 2Q FY21 in order to address critical OPSEC concerns. 3356- Funds high fidelity Aegis Integrated Air and Missile Defense (IAMD) individual, instructor, strike group and team trainers for all Advanced Capability Build (ACB) and below Aegis baselines. This line also provides funds for the research and development of advanced technologies to support Aegis Ballistic Missile Defense (BMD) builds and Command, Control, Communication, Computer, and Intelligence (C4I) advanced technology upgrades to Aegis BMD Ashore Team Trainer at [the Center for Surface Combat Systems (CSCS)] Unit Dam Neck. This line supports Surface Training Advanced Virtual Environment (STAVE) methodology by researching and developing trainers that will create an immersive and interactive learning environment and support both CNO High Velocity Learning and Ready Relevant Learning intent. NOTE: In FY18, Mine Warfare Synthetic Training requirements previously captured within PE 0204571N / Project 3356 [(High Fidelity Surface Trainer)] were realigned to PE 0603502N / Project 1235 [(Mine Warfare Planning and Analysis)]. 9999/C301 - The Barking Sands Tactical Underwater Range (BARSTUR) is a critical Pacific Missile Range Facility (PMRF) undersea training range that was installed in FY94 and is well beyond its service life. Funding is provided to accelerate the initial analysis and environmental impact studies related to replacing and modernizing BARSTUR. JUSTIFICATON FOR BUDGET ACTIVITY: This program is funded under Operational Systems Development because it includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2019
Source ID
0204571N_7_1319_PB_2019
Change Summary Explanation
The FY 2019 funding request was reduced by ($0.631) million to reflect the Department of Navy's effort to support the Office of Management and Budget directed reforms for Efficiency and Effectiveness that include a lean, accountable, more efficient government. The FY 2019 funding request was reduced by $2.654 million to account for the availability of prior year execution balances. Transfer from OPN to RDTEN in the amount of $4.942 million. 0604: Large Area Training Range (LATR): Due to a change in planned software releases to incorporate Live, Virtual and Constructive (LVC) Technology into LATR, release 6.1 was deleted. Release 6.3 will be completed in FY17 and the scheduled software releases updated for the FYDP. Updated R-4/4a. Tactical Training Range (TTR): Funding increased from PB18 in FY19 by $.565M and FY20 by $1.135M for Smart Antenna development. 2124: Human/Instructional Systems Integration: Common Instruction Systems/Semi-Automated Forces (SAF) and Unmanned-Aerial Systems Interface Selection and Training Technology (U-ASISTT) Development changed from FY17-22 to FY17-19 in order to prioritize Fleet requirements for Augmented Reality Operational Flight Trainer (OFT) Demo FY19, Next Generation Threat System (NGTS) Analysis and Reporting FY19-22 and Crew Enabled Role Player FY19-23. T-45 Augmented Reality Visual System (ARVS) Part Task Trainer (PTT) added in FY18 as a priority Fleet requirement. Updated R-4/4a. Sensors and Environment: Common Platform/Sensors and Environment (Models/Tools) changed from FY17-FY22 to FY17-19 in order to prioritize Fleet requirements for Near Eye Display Metrology System FY19, Virtual Reality (VR) and Haptic for Flight Deck Crew Demo FY20 and Collaborative Database Rapid Terrain Generation FY19-23. Updated R-4/4a. Live, Virtual, Constructive (LVC) and Visuals: U-ASISTT Development Integration to LVC schedule changed from FY17-22 to FY17-18 in order to prioritize Fleet requirements for Flight Deck Trainer Expansion Pack FY19-23. Updated R-4/4a. 3093: TACTS/LATR Replacement: Milestone C moved from 1QTR 2021 to 1QTR 2020 to accommodate Fleet requirements for an accelerated encryption capability. LRIP for Airborne Subsystem (POD), Ground Subsystem, Remote Range Unit, Portable Support Equipment Subsystem will now run from 1QTR 2020 through 4QTR 2022. Added a Production Decision for the Internal Mounts in 1QTR 2021 with the LRIP for the Internal Mounts beginning in 1QTR 2021 and running through 4QTR 2022. Full Rate Production will begin 1QTR 2023. Developmental Test C was moved from 4QTR 2020 back to 1QTR 2020. The Next Generation Technology Upgrades were pushed out to 1QTR 2023, with delivery in 4QTR 2023. Updated R-4/4a.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Autonomy
  • Cyber
  • Electronic Warfare
  • Ground and Sea Platforms
  • Human Systems
  • Sensors
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aerial Warfare
  • Augmented Reality
  • Command And Control
  • Control Systems
  • Cooperative Engagement Capability
  • Cross Domain
  • Defense Systems
  • Environment
  • Ground Control Stations
  • Naval Operations
  • Navy
  • Radar
  • Software Development
  • Systems Engineering
  • Test And Evaluation
  • Unmanned Aerial Systems
  • Virtual Reality

Readers

  • Military Training and Readiness Simulation
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Autonomy
  • Autonomy - UAVs
  • Fully Networked C3
  • Fully Networked C3 - Command and Control
  • Microelectronics
  • Space

Related Documents