Harm Improvement

Abstract

Research, Development, Test and Evaluation (RDT&E) funding for the Joint Service P3I program which will include near and far term performance improvements, cost reduction, and studies that establish future development requirements. Specific initial efforts include lower cost seeker component development and seeker aided fuzing to enhance warhead performance in low angle impacts and against certain ship targets. Excludes civilian and military manpower and their related costs and military construction costs which will be included in appropriate management and support elements.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2011
Source ID
0205601N_7_1319_PB_2011
Change Summary Explanation
Technical: Not applicable. Schedule: APKWS MS C has slid to 2Q FY10 due to unanticipated Wing Slot Seal issues which caused a delay in the completion of DT and OA testing. LRIP begins in 2Q FY 2010 after Milestone C. AARGM changed to move PCA from 2Q FY10 to 1Q FY10, DT-B2 from 3Q FY09 to 4Q FY09, OT-C from 4Q FY09 to 2Q FY10, and LRIP2 from 1Q FY10 to 3Q FY10. Change in schedule is due to software correction to enter OPEVAL. FY11 from previous President's Budget is shown as zero because no FY11-15 data was presented in President's Budget 2010.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Air Defense
  • Aircrafts
  • Anti-Radiation Missiles
  • Contracts
  • Cost Analysis
  • Electronic Intelligence
  • Engineering
  • Global Positioning Systems
  • Guidance
  • Guided Missiles
  • Millimeter Waves
  • Navigation
  • Radiation
  • Rockets
  • Test And Evaluation
  • Weapons

Readers

  • Life Cycle Cost Analysis
  • Munitions and Ordnance Engineering
  • Naval Mine Countermeasure Systems Development.

Related Documents