Guided Multiple-Launch Rocket System (GMLRS)
Abstract
Projects EG2/EG3. GMLRS rockets are surface-to-surface artillery rockets fired from the Multiple Launch Rocket System (MLRS) and High Mobility Artillery Rocket System (HIMARS) launchers. GMLRS rockets provide 24/7, all-weather precision fires to engage both area and point targets at short, medium, and long ranges. The GMLRS Program consists of three separate increments: GMLRS Dual Purpose Improved Conventional Munition (DPICM) cluster munition to engage area or imprecisely located targets; GMLRS Unitary that utilizes a 200 lb high explosive warhead to engage point targets with limited collateral damage; and GMLRS Alternative Warhead (AW) that is being developed as a non-cluster munition to replace GMLRS DPICM. GMLRS DPICM Production was terminated in response to the June 2008 Department of Defense (DoD) Cluster Munitions Policy. GMLRS Unitary is currently in full rate production. GMLRS AW is currently in the Engineering and Manufacturing Development (EMD) Phase and scheduled to enter full rate production in FY2015. The GMLRS AW rocket is 90% common with the Unitary variant.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2015
- Source ID
- 0205778A_7_2040_PB_2015
- Change Summary Explanation
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: GMLRS Alternative Warheads
- Child Accomplishment: Conduct Development Engineering, Design Component Testing, and Performance Analysis.
- Child Accomplishment: Perform technical assessments and concept studies.
- Child Accomplishment: Prepare Milestone Documentation, Risk Reduction, and Program Reviews.
- Child Accomplishment: Conduct System Test and Evaluation Activities.
- Child Cost Item: 2cbdf6e42101986b1ca18271befa4eaf
- Child Cost Item: 3fe440ce45adedd72381ef5305ed9736
- Child Cost Item: d69ec201272cf06e2f718b9aa0537aef
- Child Cost Item: 93263f073d6083f628dd33b02d31df7d
- Child Cost Item: 8adbf1011c42c2b77ded4244df90c23a
- Child Project: Guided MLRS
- Child Accomplishment: Assess and improve GMLRS rockets.
- Child Accomplishment: Conduct development engineering for IM program.
- Child Accomplishment: Investigate obsolescence cost/cost reduction opportunities/second source suppliers.
- Child Accomplishment: Conduct System Test and Evaluation activities.
- Child Cost Item: 3925515cd4bd042bb080ddd0540ad9c7
- Child Cost Item: 44c3f253ead7e3163b2cf9b56e82a004
- Child Cost Item: c577f21fdfc4919c93337184a15d4fae
- Child Cost Item: 307ffc8729d7b9c387adb4fcc2bfeab7
- Child Cost Item: 3c66ce8bda7da1cf32ebd9cebd3c401b