Joint Air-to-Surface Standoff Missile (JASSM)

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2024
Source ID
0207325F_7_3600_PB_2024
Change Summary Explanation
FY22: The FY22 funding was reduced by 3.307M for Small Business Innovation Research (SBIR). FY24: The Non Advocate Cost Analysis (NACA) identified additional FY 2024 requirements to include flight tests to support C++, AGM-158B-2, and Weapon Data Link (WDL), which leads to an FY 2024 total adjustment totaling 20.880M. Addition of 12M for M2 software and 0.273M inflation adjustment.
Service Agency Name
Air Force

Entities

Organizations

  • United States Air Force

Tags

Communities of Interest

  • Kinetic Weapons

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Bomber Aircraft
  • Data Links
  • Engineering
  • Global Positioning Systems
  • Manufacturing
  • Operational Effectiveness
  • Power Converters
  • Procurement
  • Production
  • Reliability
  • Software Development
  • Standoff Missiles
  • Test And Evaluation
  • Test Equipment
  • Weapon Systems

Related Documents