Joint Tactical Ground System

Abstract

JTAGS transitions to US Space Force in Fiscal Year 2024 (FY2024). The Joint Tactical Ground Station (JTAGS) is a post-production, Acquisition Category (ACAT) III program. JTAGS provides missile warning message data for the Air and Missile Defense (AMD) architecture and improves performance for Integrated Air and Missile Defense Fire Control Systems/Composite Army Air and Missile Defense Brigades. JTAGS disseminates near real time warning, alerting, and cueing information on ballistic missile launches and other tactical events of interest throughout the theater using existing communication networks, providing critical support to Combatant Commanders in their Areas of Responsibility (AOR). Four outside the continental United States (OCONUS) deployed JTAGS units, which are deployed in three theaters (United States Pacific Command (PACOM), United States Central Command (CENTCOM), United States European Command (EUCOM)), constitute DoD's only in-theater system providing space-based missile warning. The fifth CONUS system is used as an institutional trainer but is available as a deployable asset. JTAGS is designated as the in-theater element of the United States Strategic Command's Theater Event System (TES), supporting all Theater Missile Defense pillars, affording the shortest sensor-to-shooter connectivity. On 14 January 2016, the Army Acquisition Executive designated the JTAGS Pre-Planned Product Improvement (JTAGS P3I) program as a separate ACAT III modification program. The JTAGS Program Element (PE) supports development and testing of the JTAGS Block II Preplanned Product Improvements (P3I) program based on the JTAGS Operational Requirements Document (ORD), additive Joint Requirements Oversight Council - Memorandum (JROC-M) requirements, and the formal JTAGS Block II Capability Development Document (CDD) thresholds. P3I upgraded JTAGS to a Block II configuration for operation with the next generation of Space Based Infrared System (SBIRS) satellites, and improved warning tactical parameters and timeliness. The JTAGS Block II P3I program based on the 2009 JTAGS ORD is on contract as a two-phase development effort. JTAGS Block II P3I Phase 1 is complete. The final developmental efforts of JTAGS Block II P3I Phase 2 to achieve 2009 ORD requirements completed in FY2022. Follow-on Test and Evaluation (FOTE) completed in FY2022 with Materiel Release efforts to be conducted in FY2023. The JTAGS Block II CDD addresses evolving User-driven needs such as emerging threats and interface efforts that were not known at the time the JTAGS ORD was validated.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2025
Source ID
0208053A_7_2040_PB_2025
Change Summary Explanation
JTAGS transitions to the US Space Force in FY2024. The reduction in funds reflects the transition of the program and no funding requested in FY2025.
Service Agency Name
Army

Entities

Organizations

  • United States Army

Tags

Readers

  • Critical Infrastructure Protection in CBRN and WMD Threats.
  • Missile Defense Systems.
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Space
  • Space - Satellites

Related Documents