POLLUTION PREVENTION TECHNOLOGY
Abstract
This program element (PE) matures and demonstrates pollution prevention advanced technologies required for sustainable operation of Army weapon systems, to include compliance with regulations mandated by federal, state, and local environmental and health laws. Technology thrusts under this project include demonstration of advanced technologies to enable sustainment of propellant, explosive and pyrotechnic production and maintenance facilities and training ranges through elimination or significant reduction of environmental impacts. These technologies will ensure that advanced energetic materials required for future force's high performance munitions are developed that meet weapons lethality and survivability goals and that are compliant with environmental and health laws. The cited work is consistent with the Director, Defense Research and Engineering Strategic Plan, the Army Modernization Strategy, the Army Science and Technology Master Plan, and supports the Army Strategy for the Environment. The project is fully coordinated and complementary to PE 0602720A, Project 895. This project transitions technologies developed under that PE. Work in this project is performed by the Research, Development, and Engineering Command the Army Research Laboratory, Aberdeen Proving Ground, MD, the Armaments Research, Development, and Engineering Center, Picatinny Arsenal, NJ, and the Aviation and Missile Research, Development, and Engineering Center, Redstone Arsenal, AL in conjunction with the Army Public Health Command (Provisional), Aberdeen Proving Ground, MD.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2012
- Source ID
- 025_0603728A_3_2040_PB_2012
Related Documents
- Root: Environmental Quality Technology Demonstrations
- Child Accomplishment: Pollution Prevention Technology