SATCOM Ground Environment (SPACE)
Abstract
Military Satellite Communication (MILSATCOM) systems are joint program/project efforts to satisfy ground mobile requirements for each Service, the Joint Chiefs of Staff (JCS), the National Command Authority, the combatant commanders, the National Security Agency, the Office of the Secretary of Defense, and other governmental, non-DoD users. The worldwide MILSATCOM systems are: Ultra High Frequency (UHF) Follow-On Satellite System; Air Force Satellite (FLTSAT/AFSAT) system; the Mobile User Objective System (MUOS); the Super High Frequency (SHF) Defense Satellite Communications System (DSCS); the Wideband Global SATCOM (WGS); the MILSTAR Extremely High Frequency (EHF)(Low Data Rate (LDR) and Medium Data Rate (MDR); the Advanced Extremely High Frequency (AEHF); and future MILSATCOM capabilities, all of these systems are required to support legacy, interim and emerging communication space architectures and Objective Force requirements. The Army is responsible for materiel development, acquisition, product improvement, testing, fielding and integrated logistics support of ground satellite terminals and SATCOM control subsystems and all associated equipment used to provide range extension of Command, Control and Communications Systems for the Warfighter. The Army also participates in the development of MILSATCOM programs, including architectures, payloads, waveforms, antennas and terminal developments to ensure US Army equities are appropriately addressed with our sister services. This includes technology assessment efforts associated with the integration of MILSATCOM components to US Army Landwarnet This responsibility also includes maintaining the life cycle logistics support required to achieve end-to-end connectivity and interoperability, satisfying JCS Command, Control, Communications and Intelligence (C3I) in support of the President, JCS, combatant commanders, Military Departments, Department of State, and other government Departments and Agencies. This program is designated as a DoD Space Program.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2012
- Source ID
- 0303142A_7_2040_PB_2012
- Change Summary Explanation
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: DSCS-DCS (PHASE II)
- Child Accomplishment: Netcentic Systems Engineering and Analysis
- Child Accomplishment: Initiate integration and test efforts on the Remote Monitor Control Equipment (RMCE)
- Child Accomplishment: SATCOM Engineering Lab (SEL), PM Administration and Systems Engineering Technical Assistance (SETA) efforts
- Child Project: MILSATCOM SYSTEM ENGINEERING
- Child Accomplishment: Protected Advanced EHF (AEHF) Communications System Engineering
- Child Accomplishment: Wideband Global SATCOM (WGS) Communications System Engineering and Intelligence, Surveillance, Reconnanisance (ISR) Migration
- Child Accomplishment: Experimentation, development, testing and certification of critical SATCOM and SOTM communication and network technologies.
- Child Accomplishment: Federal Communications Commission/ International Telecommunciations Union (FCC/ITU) SOTM Regulatory Proposals/Analyses/Modifications
- Child Accomplishment: Protected Terminal COTM and Wide Area Network (WAN) Prototyping
- Child Accomplishment: Intelligence, Surveillance, Reconnanisance (ISR) POR Migration to OPM WIN T SATCOM Solutions. Includes Reginal Hub Node (RHN) mods, Joint Management and Operations Subsystem (JMOS) mods, Terminal Cert
- Child Accomplishment: Small Business Innovative Research/Small Business Technology Transfer Programs
- Child Accomplishment: Protected COTM Technical Reference Terminal Prototyping
- Child Cost Item: 7250ecb706f7b4a5b299874bebeb3dd3
- Child Cost Item: 23e2320b4bb55e49325fca357a1e246b
- Child Cost Item: 04e4992cca518243262586ec32bb1067
- Child Cost Item: 4724dec6ac30180f37b45c13902dd6c1
- Child Cost Item: 270e98914c96b26ba09923758f81e87b
- Child Cost Item: a7fa29eb32f91432bd86177ed8b1d617
- Child Cost Item: 5a30deb4384c8d345864e3d5236c2c59
- Child Cost Item: 299cb7f2f811616aa7124e9947be432b
- Child Cost Item: bba036c6e7b68987daae160ad33eafc1
- Child Cost Item: 7b45582685f7662a8fec61e6e105b209
- Child Cost Item: 2d8fab76cf67403dc83f23189068921c
- Child Cost Item: 3388979fe8a75a282f3ddaaf36a2d2ff
- Child Cost Item: 5c219dbb954e371a59cc59cb75575560
- Child Project: MBAND INT SAT TERM MIST
- Child Accomplishment: Requirements process/analysis