Spacelift Range System
Abstract
The Eastern Range (ER) at Patrick Air Force Base (AFB)/Cape Canaveral Air Force Station, FL, and the Western Range (WR) at Vandenberg AFB, CA, make up the Spacelift Range System (SLRS), also known as LTRS. They provide tracking, telemetry, communications, flight safety, and other capabilities to safely conduct: national security, civil, and commercial spacelift operations; ballistic missile and missile defense evaluations; and aeronautical and guided weapons tests. Decreasing reliability of aging range systems forces the AF to use redundant assets during launches to ensure range availability, increasing operations and maintenance costs. The AF is addressing range deficiencies in FY11 via multiple contracts. The Range Standardization and Automation (RSA) IIA contract (OPAF only in FY11) modernizes control/display and communications systems. The SLRS Contract (SLRSC) modernizes command, telemetry, and radar instrumentation; and provides systems engineering, architecture management, and system level testing. RSA IIA and SLRSC end in FY11. The AF awarded a follow-on systems engineering and integration contract in Dec 09 and will award a follow-on modernization and sustainment contract in FY11. Planned communications system upgrades will comply with OSD policies and standards for netcentricity, global information grid interface, information assurance, and test/training enabling architecture. These upgrades to fielded systems are categorized as Budget Activity 7, Operational Systems Development.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2011
- Source ID
- 0305182F_7_3600_PB_2011
- Change Summary Explanation
- FY09: AF increase of $1M for systems engineering.
- Service Agency Name
- Air Force
Entities
Organizations
- United States Air Force
Related Documents
- Child Project: Launch and Test Range System (LTRS) Modernization
- Child Accomplishment: Major Thrust: Modernize timing and safety systems to complete activation of Western Range (WR) Operations Control Center. Modernize telemetry, radar, and command destruct instrumentation on WR and...
- Child Accomplishment: Major Thrust: Conduct independent systems engineering and integration (SE&I) effort starting in FY10. Continue systems engineering efforts previously accomplished under SLRSC.
- Child Accomplishment: Major Thrust: Provide program support, to include System Program Office operations, SETA, and FFRDC.
- Child Cost Item: 3284f0baae97a858d31b3a218a3c1eef
- Child Cost Item: eb2232ab1211e7dbbddb8ee89433834d
- Child Cost Item: ca3466fa179e7e825c0d0f0e18846907
- Child Cost Item: 5456f7daba433564390146f63bc45105
- Child Cost Item: b89d00a8fe1464f3712f4832df7a2d6b
- Child Cost Item: 3e9c6966b71b5671f61da2cb255c5aff