Endurance Unmanned Aerial Vehicles
Abstract
This PE focuses USAF efforts on long endurance platforms that provide days, months, or years of endurance and their associated sensors and communications suites. Efforts include, but are not limited to, optionally piloted airships, Remotely Piloted Aircraft (RPAs), or more standard aircraft platforms flown as manned or unmanned. The Integrated Sensor Is Structure (ISIS) project was planned to develop a radar that is fully integrated into a station-keeping, stratospheric airship. ISIS was intended to support the nation's need for persistent wide-area surveillance, tracking, and engagement of time-critical air and ground targets. Automated surveillance and tracking included air targets to the radar horizon of 600 km and all ground targets to a range of 300 km. The radar aperture was intended to provide track data directly to users in-theater. The Medium Altitude Global ISR and Communications (MAGIC) project develops a multiple-day, medium altitude ISR unmanned aircraft system (UAS) to provide long endurance surveillance with a multiple sensor payload. This concept was initiated by the Office of the Secretary of Defense (OSD) as a Joint Capabilities Technology Demonstration (JCTD) in the 3rd Quarter FY 2010 with a competition between five defense industry partners. Aurora Flight Sciences' Orion Remotely Piloted Aircraft (RPA) concept was chosen as the JCTD candidate by OSD/Director of Defense, Research and Engineering (DDR&E) per the recommendation of the Combatant Commands. The MAGIC/Orion RPA initiative was subsequently released from the JCTD process and transitioned to the Air Force as the sponsor of this developmental initiative in the 3rd Quarter FY 2011. The Air Force is scheduling the second flight series for Aurora Flight Sciences' Orion RPA after having completed a first flight at NAWS China Lake, CA on 24 Aug 2013. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2015
- Source ID
- 0305205F_7_3600_PB_2015
- Change Summary Explanation
- Congressional Adds of $60M in FY2013. FY13 reduction due to Sequestration. FY14 reduction due to Congressional Directed Mark FY15 reduction due to higher Air Force priorities.
- Service Agency Name
- Air Force
Entities
Organizations
- United States Air Force
Related Documents
- Child Project: Integrated Sensor IS Structure
- Child Accomplishment: ISIS
- Child Project: MAGIC