RQ-4 UAV

Abstract

This program element funds related Air Force projects sharing the RQ-4 platform in common: the RQ-4 Block 30, the RQ-4 Block 40, RQ-4 Capability Enhancements, and Multi-Platform Radar Technology Insertion Program (MP-RTIP). The RQ-4 Block 30 and Block 40 projects support the development and testing of the ACAT 1C RQ-4 capability and the initiation of the major modification ACAT programs. The majority of the modernization funding was transferred to the Capability Enhancement project (675149) to support upgrades and modifications, including established ACAT I and II programs, to the fielded RQ-4 weapon system to meet evolving threats and warfighter requirements. The MP-RTIP project completes development and testing of the baseline MDAP MP-RTIP sensor capability. When judged feasible and affordable, this program will participate in the development, testing, and implementation of international standards to enhance joint, allied, and coalition interoperability. Studies and activities may be initiated to further explore the utility of incorporating the emerging architectural standards such as the USAF Unmanned Aerial Systems (UAS) Command and Control Initiative (UCI) or the DoD's Unmanned Control Segment standards (UCS) and Open Mission Systems (OMS). Ground Segment Modernization Program (GSMP) and Communication System Modernization Program (CSMP) will incorporate UCI and UCS standards. Per direction of USD(AT&L), the RQ-4 program was restructured from the original project 675144 (Baseline) into multiple projects: (1) Block 30, (2) Block 40, (3) GroundSegment/Communications System, and (4) Common-Airborne Sense and Avoid (C-ABSAA). In FY17 the Ground Segment/Communications System project (675147) ended. Prior year funds in the amount of $2031.377M were accounted for in project 675144 and $85.375M were accounted for in project 675147. The FY2018 funding was increased by $8.000 million to develop a Block 40 ISR Payload Adapter design and documentation. This program element may include necessary civilian pay expenses required to manage, execute, and deliver RQ-4 UAV weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605826F, 0605827F, 0605828F, 0605829F, 0605830F, 0605831F, 0605832F, 0605898F, and 0605833F. As directed in the FY 2018 NDAA, Sec 825, amendment to PL 114-92 FY 2016 NDAA, Sec 828 Penalty for Cost Overruns, the FY 2018 Air Force penalty total is $14.373M. The calculated percentage reduction to each research, development, test and evaluation and procurement account will be allocated proportionally from all programs, projects, or activities under such account. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2020
Source ID
0305220F_7_3600_PB_2020
Change Summary Explanation
- FY 2020 funds adjustment attributed to Air Force adjustments/re-phasing for higher priorities (-$46.8M), realignment for proper execution (+$4.3M), and RDT&E increase for Mobile User Objective System (MUOS) (+$20.0M).
Service Agency Name
Air Force

Entities

Organizations

  • United States Air Force

Tags

Communities of Interest

  • Air Platforms
  • Autonomy
  • Cyber
  • Sensors
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircrafts
  • Airframes
  • Command And Control
  • Communication Systems
  • Cost Analysis
  • Ground Control Stations
  • High Altitude
  • Program Management
  • Sense And Avoid Systems
  • Signals Intelligence
  • Surveillance
  • Synthetic Aperture Radar
  • System Of Systems
  • Systems Engineering
  • Test And Evaluation
  • Unmanned Aerial Systems
  • Unmanned Aerial Vehicles

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.

Technology Areas

  • Autonomy
  • Fully Networked C3
  • Fully Networked C3 - Command and Control

Related Documents