Standard Missile Improvement

Abstract

Missile Integration with Air and Missile Defense S-Band Radar (AMDR-S) for DDG 51 Flight III ships, and with other platforms/Combat System baselines, will include requirements review/updates and analysis, verification; technical documentation, design review and working group SME support, missile/radar integration, missile test hardware procurement, risk assessment, safety, test and evaluation planning, analysis, and data collection. Deliverables include interface control documents (ICDs) changes, missile specifications changes, and engineering documents updates to support AEGIS Configuration Baseline (ACB) 20 IPR Process (FY 18-21) Engineering Development Model (EDM) testing (FY 2016-2020); Combat Systems Engineering Development Site (CSEDS) , Moorestown, New Jersey Combat System/missile integration testing at PMRF/ARDEL Kauai, HI (FY 2018-2020); Waterfront Integration Testing (WIT) FY 2022 and ACB 20 for DDG 51 FLT III Electromagnetic Environmental Effects (E3) and Hazard of Electromagnetic Radiation to Ordnance (HERO) Testing, analysis, and reports. SM-2 BLK IIIC, formerly STANDARD Missile-2 Improvements, engineering changes funding is for the design, systems engineering, analysis, integration, and test of replacements for obsolete components as well as performance improvements to address emerging threats. Analysis will include evaluation of transition to an active seeker baseline leveraging the investment made with the SM-6 BLK I and ESSM Block II missiles. Initial funding is for the requirements generation, risk reduction/mitigation, and documentation leading to the commencement of the obsolescence project. Capability improvements: Enhanced stream-raid performance against numerous threats via target resolution and missile/target pairing logic, over-the-horizon capability for increased depth of fire, enhanced capability against electronic attack, improved firepower due to decreased dependence on illuminators, and enhanced fuzing. The program has been designated an Accelerated Acquisition (AA) program by the CNO/ASN RDA on November 14, 2017. The program schedule will be shifted to reflect the change in process. Initial Capability (IC) planned for Q2FY2023.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2020
Source ID
0439_0604366N_5_1319_PB_2020

Tags

Fields of Study

  • Engineering

Readers

  • Fire Suppression Systems Design.
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Microelectronics

Related Documents