Training System Aircraft
Abstract
This program element provides for design, development, integration and test of various pre-production platform improvements for Naval Undergraduate Flight Training Systems which include T-45, T-6, TH-57, and T-44 aircraft. Continued development engineering for improvements in reliability, maintainability, safety and meeting Federal Aviation Administration (FAA) Next Generation Air Transportation System (NextGen) flight safety requirements are required to ensure maximum benefit is achieved to provide effective cost of ownership and availability of aircraft to meet Chief of Naval Air Training (CNATRA) student training requirements. Specific efforts include: T-45 Training System (TS) Required Avionics Sustainment Program (RASP) Phase I Automatic Dependent Surveillance-Broadcast (ADS-B) Out; T-6 Joint Primary Aircraft Training System (JPATS) Communication and Navigation System/Air Traffic Management (CNS/ATM); TH-57 Follow-On Training System; T-45, T-6, TH-57 and T-44 Training System Improvements, T-6 Flight Management System and T-45 Physiological Episode (PE) mitigation analysis. This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production decision. The FY 2019 funding request was reduced by $2.016 million to account for the availability of prior year execution balances.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2019
- Source ID
- 0603208N_5_1319_PB_2019
- Change Summary Explanation
- FY 2019 adjustments include funding for Naval Aviation Physiological Episode Mitigation and Aviation Technical Corrections. Technical: T45 Required Avionics Sustainment program (RASP)the FY 2019 funding request was reduced $2.016 million to account for the availability of prior year execution balances. Schedule: Training System Improvement schedule updated T-6 System Safety Improvements to the Joint Primary Aircraft Training System (T-6) for Crash Survivable Cockpit Voice Recorder (CSCVR) and Controlled Flight Into Terrain (CFIT) Avoidance which will extend the program to FY 2020. Training System Improvement System Development schedule updated to extend through FY 2023. Schedule: T-6B Flight Management System schedule to include a System Development Design Review and Hardware development. Initially this was a joint program with the United States Air Force, due to reprioritization this is now a United States Navy only program. Causing this to be a New Start in FY 2019. Schedule: T-45 Physiological Episode Mitigation T-45 Acceptance Test in FY 2019.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Training Aircraft Updates
- Child Accomplishment: T45 Required Avionics Sustainment Program (RASP)
- Child Accomplishment: T6 A/B Communication and Navigation System/Air Traffic Management (CNS/ATM)
- Child Accomplishment: TH-57 Follow-On Training System
- Child Accomplishment: Training System Improvements
- Child Accomplishment: Naval Aviation Physiological Episode
- Child Accomplishment: Flight Management System (FMS)
- Child Cost Item: 7359665470caf546d1ce7794cca382f6
- Child Cost Item: f0c628f9a162ffadb7df1863c8cc36f1
- Child Cost Item: 98167b3d95d43d7dfe1c1402a56569ad
- Child Cost Item: 1b4da3d554498df0cd0c3174f14ff4b7
- Child Cost Item: 1101f84c81de9605d9832d9001b0f1d6
- Child Cost Item: 674ee6eaae4049c2d040086e491bf561
- Child Cost Item: 76e0ed6d821b64781e39b2fa67dcea6a
- Child Cost Item: d414db2b9ccfb2a49f15c60f86fe2199
- Child Cost Item: ba8d6512e4708de8793d56d75350fa0f
- Child Cost Item: b3278933922cdc5c53112b32c930540f
- Child Cost Item: 09930d0cbba55b1a1ddc35e71fa9f14f
- Child Cost Item: 3e748cc187fe8b96089ce39ddfddd519
- Child Cost Item: c4c3caa0abf8d14a61fa0a42ff9649c7
- Child Cost Item: 5b10ef02e629efe18437693d13d0d812
- Child Cost Item: 607f7abd97599f823cc7c563b3e4ef23
- Child Cost Item: cc9c9892089956ff3b0943743aba29a5
- Child Cost Item: aa22e32a19728cf08f90f87342a2276a
- Child Cost Item: 58d5d476d5812a0800611e1dcdf0d931
- Child Cost Item: f1a87bd8cf5cf1628fb74f0c6874e822
- Child Cost Item: 81c4203d2cf66463703abd9a6f1d0a9c
- Child Cost Item: 46baa4dab55fe384009a8700f984d16b
- Child Cost Item: 2d4981dbd85b26a9f34633badca891b5
- Child Cost Item: 56f7bd9412db2677415cef02fc147f6e
- Child Cost Item: 502704de0fae104cbf299aced02863ea
- Child Cost Item: 666e8d94e5b373d5761aa3bc6a06650e
- Child Cost Item: 7d3e6ef8dcafe0e13c406082d0720aad
- Child Cost Item: e69025cc02b72fcfd901411768a46463
- Child Cost Item: d37d8ea68d194f6315fb29d8860846ef
- Child Cost Item: e78828f56e7661109b8dd23b38b100f3
- Child Cost Item: 00d3e118d0bfc65714c521ccf0d7480c
- Child Cost Item: dcc969cc9bef59ebd4c1ab130d471d24
- Child Cost Item: 0fb47a9960c23687fe8858deaadd6c3a
- Child Cost Item: 0ccb91c8a7a8bd561a4a55f5ea2bff97