Training System Aircraft
Abstract
This program element provides for design, development, integration and test of various pre and post production platform improvements for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-57, TH-73A, T-44 Follow-On: Multi-Engine Training System (METS), and T-45 Follow-On: Undergraduate Jet Training System (UJTS). Continued development engineering for improvements in reliability, maintainability, and safety are required to ensure maximum benefit is achieved to provide effective cost of ownership and availability of aircraft to meet Chief of Naval Air Training (CNATRA) student training requirements. Specific efforts include: T-45, T-6, TH-57, T-44, and TH-73A Training System Improvements such as development and sustainment engineering change proposals (ECPs), avionics reliability and modernization, corrosion prevention ECPs, obsolescence ECPs, and new solutions required to meet evolving fleet training requirements; T-45 and T-6 Physiological Episode (PE) mitigation analysis; T-44 Follow-On: METS development; and T-45 Follow-On: UJTS development. This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2022
- Source ID
- 0603208N_5_1319_PB_2022
- Change Summary Explanation
- Technical: Removed Federal Aviation Administration (FAA) Next Generation Air Transportation System (NextGen) flight safety requirements from Mission Description; effort complete. Added T-45 Follow-On: Undergraduate Jet Training System (UJTS) to Mission Description and Budget Item Justification. Added T-45 Follow-On: Undergraduate Jet Training System (UJTS) Acquisition Strategy. Removed TH-57 Follow-On: Advanced Helicopter Training System from Mission Description; effort complete. Funding added to PU 3367 for T-45 Follow-on: Undergraduate Jet Training System (UJTS) starting in FY23. Removed acquisition strategies for T-45 Training System: Required Avionics Sustainment Program (RASP) and T-6 Communication, Navigation, System/Air Traffic Management (CNS/ATM). Both research and development programs are complete. Schedule: T-45 Required Avionics Sustainment Program (RASP) removed from schedule. RDT&E,N program completed in FY19; no longer in budget. Training System Improvements: FY22 study added for T-45 Follow-On: Undergraduate Jet Training System (UJTS) for continuation of pre-acquisition training system development. Training System Improvements: T-6 Joint Study Efforts reduced from 4Q2025 to 4Q2021 to align with ongoing T-6 platform improvements plans and efforts. Training System Improvements: T-6 CSCVR & CFIT IT&E moved to 4Q2020 through 4Q2021 due to delays in contract award. Training Systems Improvements: Added T-45 and T-6 Integrated Logistics Support 1Q2022 to 4Q2026. Naval Aviation Physiological Episodes: T-45 PE Support combined with T-45 Product Development efforts in order to reflect contracting actuals. T-45 and T-6 added 1Q2021-4Q2026. Naval Aviation Physiological Episodes: GGU-25 CDR added 3Q2020 TH-57 Follow-On: Advanced Helicopter Training System (TH-73A) removed from schedule. RDT&E,N program completed in FY19; no longer in budget. T-44 Follow-On: Multi-Engine Training System (METS) added to schedule.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Training Aircraft Updates
- Child Accomplishment: Training System Improvements
- Child Accomplishment: Naval Aviation Physiological Episode (PE)
- Child Accomplishment: T-44 Follow-On: Multi-Engine Training System (METS)
- Child Cost Item: 22c47dcec8eb7f48c9f3110430b07017
- Child Cost Item: 28e01ea1bb8c146715e9f0e6d1e47261
- Child Cost Item: a661567e8a9db72bcfdcde6531218c06
- Child Cost Item: 834d3ce31a2574644014263ddd93f2d3
- Child Cost Item: af71b6eb77f149746ecd845c59e810f6
- Child Cost Item: 5a321944145349ec8e1dde264fec8be8
- Child Cost Item: 2cb1af4d1d34dc71a1ef4559797ca4d9
- Child Cost Item: d63f9ac0e42ebe6724f06221a26960eb
- Child Cost Item: 06282937f253eeef61e1276b0570eb85
- Child Cost Item: 641f326f45ae7b23226e249254df2a31
- Child Cost Item: 725f0c68bbd31995e34ec81e388d7311
- Child Cost Item: f35cc9ed5ee3011f8da91571177a7715
- Child Cost Item: 332c89842e0ac2cc4c46387b8cffd345
- Child Cost Item: 200b57b3688ba44d026375528f93ad9a
- Child Cost Item: 4a8e76b7e40ae08a7ea28642c740adf2
- Child Cost Item: d8cbb49cb504b5ccdbaaa0f845b8800f
- Child Cost Item: 5d7fe09b3e2906625e820f403eb4d708
- Child Cost Item: 2f0c2f8553c8521cb60a3b74f276b063
- Child Cost Item: 70d577570fd73988d217905a689cd8ed
- Child Cost Item: f084daec6219700cb23c3f8b8e53790c
- Child Cost Item: acfde8eeeaded3a7ef8aef01d2ef6825
- Child Cost Item: 3455ba89f154e32897bec60bf0ae8d08
- Child Cost Item: 907d11f1b73e06eb266abd225743ede7
- Child Cost Item: e5960ec135e09d145b681b2eca458482
- Child Cost Item: b8a1dbfdef17494369c733ccf6694000
- Child Cost Item: 3e1795fca2cbba2150d9cf64b81030a4
- Child Project: Physiological Episodes
- Child Accomplishment: T-45 Physiological Episode Mitigation
- Child Accomplishment: T-6 Physiological Episode Mitigation
- Child Cost Item: 8abf8587b9f8d9c706bcdff162180247
- Child Cost Item: 4375a1a0204abd3c6f88b12d3396a4df
- Child Cost Item: e8851f1c688c9b9a710aba4546080426
- Child Cost Item: 50ba83ab53b8dcbef431a8e6cd6073cd