Training System Aircraft
Abstract
This program element provides for design, development, integration and test of various pre and post production platform improvements for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-57, TH-73A, T-44 Follow-On: Multi-Engine Training System (METS), and T-45 Follow-On (Undergraduate Jet Training System (UJTS)/Tactical Surrogate). Continued development engineering for improvements in reliability, maintainability, and safety are required to ensure maximum benefit is achieved to provide effective cost of ownership and availability of aircraft to meet Chief of Naval Air Training (CNATRA) student training requirements. Specific efforts include: T-45, T-6, TH-57, T-44, and TH-73A Training System Improvements such as development and sustainment engineering change proposals (ECPs), avionics reliability and modernization, corrosion prevention ECPs, obsolescence ECPs, and new solutions required to meet evolving fleet training requirements; T-45 and T-6 Physiological Episode (PE) mitigation analysis; T-44 Follow-On: METS development; and T-45 Follow-On (UJTS/Tactical Surrogate) development. This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2024
- Source ID
- 0603208N_5_1319_PB_2024
- Change Summary Explanation
- Technical: N/A Cost: FY 2024 funding request was increased by $18.629M, which included a $30.000M increase in support of the Tactical Surrogate portion of the T-45 Follow-On (UJTS/Tactical Surrogate) development program, and a $7.680M decrease for the UJTS portion of the program, along with an overall reduction of $3.700M for PU 3367 and overall increase of $0.009M for PU 9099. Schedule: N/A
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Training Aircraft Updates
- Child Accomplishment: Training System Improvements
- Child Accomplishment: T-44 Follow-On: Multi-Engine Training System (METS)
- Child Accomplishment: T-45 Follow-On Undergraduate Jet Training System / Tactical Surrogate
- Child Cost Item: d5dc32e5e870a61cf63cf05fef76a729
- Child Cost Item: 8ceb60368f4a01484f6a48fa599e269e
- Child Cost Item: 3a1fdce6f60a26e8adf75d76f3b02b82
- Child Cost Item: fcd645475beeeea2ffe82f865cd97ad2
- Child Cost Item: fb049dd7cdb81750f573cb19c5b1e70a
- Child Cost Item: 816763e7a2c6ebe3933552b3e644e7ab
- Child Cost Item: e295d7b4fb1905bc918860612993b40a
- Child Cost Item: 1403b9d5ebcdf40ea37821eabe23b493
- Child Cost Item: 99fd4388b077a1fcdf7b5e5a8b0542ce
- Child Cost Item: b811fdd79b3ff23fb9b0edad1bc2edc1
- Child Cost Item: 9cf25da90704610910bc68cb9539b115
- Child Cost Item: 313acdb3b06a05feb22fb4469c4de015
- Child Cost Item: 310c4a10ad0d76c427dbbf5c4f62a22b
- Child Cost Item: d2b1b61bc2bd0faf17aa05c2ef0c6925
- Child Project: Physiological Episodes
- Child Accomplishment: T-45 Physiological Episode Mitigation
- Child Accomplishment: T-6 Physiological Episode Mitigation
- Child Cost Item: adfda737bf8ff8d48d93c9506517ff32
- Child Cost Item: 029fc4374157da882e39edee8ce07ddf
- Child Cost Item: d2dfcdd9d73ffb303d5a957e5f17552c
- Child Cost Item: 6db10011e5d718876b8102750371984b
- Child Cost Item: cd6b96076e6ed6a331bb74bc53767781
- Child Cost Item: badef3d0ec7af0e8298ef8a063507184