Tactical Airborne Reconnaissance
Abstract
This program element funds efforts to develop Concept of Operations in support of the Navy's overall Unmanned Aircraft System (UAS) strategy integrating UASs into the Chief of Naval Operations Navy Vision of Sea Power 21 (Sea Shield, Sea Strike, Sea Basing, and FORCEnet). Also funds Navy's contribution supporting the Joint Technology Center/System Integration Laboratory providing experimentation for Unmanned Aerial Vehicle technology assessment, insertion, demonstration, transfer, as well as simulation and exercise support. This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2014
- Source ID
- 0603261N_4_1319_PB_2014
- Change Summary Explanation
- Technical: Not applicable. Schedule: Not applicable.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: UAV Conops
- Child Accomplishment: Studies and Demonstrations
- Child Accomplishment: Shipboard CONOPS
- Child Accomplishment: Engineering and Program Support
- Child Accomplishment: NATO Standardization Agreements and Interoperability
- Child Accomplishment: Architecture Support /Common Ground Station
- Child Accomplishment: Naval Interoperability & Standardization
- Child Cost Item: 1dc9d77f5d8402a979c80411d83f1848
- Child Cost Item: 456ff05a596841283b24babca8e48fbc
- Child Cost Item: 32092a90d33a96b3451277efe0af556d
- Child Cost Item: a1cdfd6528b48157b2304fba6d18ba04
- Child Cost Item: ffa38d202a7c3d31feca274ca91f7098
- Child Cost Item: a26595c883ee1f8ed984ad585643dddc
- Child Cost Item: c19b5277c336fff9f8d3d815e13c8c1e
- Child Cost Item: d4bea2a96999ee28368ce5e4615c79be
- Child Cost Item: bd48cc7574ab49fe40c509a1a18e8286
- Child Cost Item: da8736e86ec527f4ab18cf7904810611
- Child Cost Item: a451a4d2f963c12342edc42ab7a8abb5
- Child Cost Item: 9324888303bb03359d2c40a348c0e3ce
- Child Cost Item: 70cff560c35c55884c2c29e62ae6a1e9
- Child Project: Joint Tech Center/System Integ Lab
- Child Accomplishment: MUSE Development
- Child Accomplishment: Engineering and Maintenance
- Child Accomplishment: Program Management
- Child Cost Item: 6d7738aadf2a28c3ffdd7f846e3d0d1d
- Child Cost Item: 5005d5e888e5ce3f8425f39ff43757cf