Ship Prel Design & Feasibility Studies

Abstract

0408 - SURFTECH - Ship Development project supports the evaluation of advanced and alternative technologies through the Surface Ship Technology (SURFTECH) process for suitability for meeting total ship concepts capability needs. - OCEAN CLASS AGOR - FY10 Ship Preliminary Design and Feasibility Studies to support procurement of two AGOR ocean Class vessels in FY11 and FY12. - LCC Class ESA - Assessments of the LCC 19 & 20 will be conducted to determine life extensions under project 0408. 0409 - DDG 51 FLT III Concept Development - Develop Preliminary Analysis, Testing, and Design for introduction of DDG 51 FLT III in FY16. 2474 - LSD(X) is expected to functionally replace LSD 41 class (8 ships) and LSD 49 class (4 ships) for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. New design efforts are required to identify viable alternatives, including examining a reduced cost variant of LPD 17 Class. Funding supports JCIDS, GATE and Milestone processes. LSD(X) was previously budgeted in PE 0604311N. 3195 - JCC(X) was planned as a mobile, self-sustaining platform with robust C4ISR capability for a Joint Force Commander and staff and provides in-theater command and control should a land-based headquarters be unavailable, constrained or threatened. 3226 - Green Water Craft will provide maritime security, stability operations, and increased maritime domain awareness in compliance with Global Maritime Security objectives and in direct support of Global Fleet Stations (GFS). Funding will provide for craft feasibility and sizing study and subsystem mockups in support of initial craft production. 3261 - Preliminary Ship Design and Contract efforts to support procurement of a T-AGOS Class vessel in FY13. T-AGOS ocean surveillance ships have a single mission to gather underwater acoustical data and operate to support the anti-submarine warfare mission. Congressional Adds: Support for Naval Ship Hydrodynamic Test Facility, Bow Lifting Body Ship Research and Low Signature Defensive Weapon System for Surface Combatant Craft.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2012
Source ID
0603564N_4_1319_PB_2012
Change Summary Explanation
DDG-51 Flt III - Reflects approved new start reprogramming request initiating Flight III Concept Study in FY10. FY12 - begins Preliminary Design efforts to reflect Flight III impacts on DDG 51 Class ships, to include superstructure structural modifications, air conditioning plant upgrades, and additional Ship Service Electrical Power increase. JCC(X) - Decrease in FY10 Reflects LCC(R) program deferrment. LSD(X) - Begin new design efforts in FY12 that are required to identify viable alternatives, including examining a reduced cost variant of LPD 17 Class. T-AGOS - Conduct Preliminary ship Design and Contract efforts to support procurement of a T-AGOS Class vessel in FY13.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Acquisition
  • Command And Control
  • Command And Control Systems
  • Contracts
  • Cost Analysis
  • Department Of Veterans Affairs
  • Feasibility Studies
  • Lifting Bodies
  • Maritime Domain Awareness
  • Maritime Security
  • Molecular Dynamics
  • Navy
  • Procurement
  • Prototypes
  • Ships
  • Surveillance
  • Uss Arleigh Burke

Readers

  • Joint Military Operations and Doctrine.
  • Military Science and Technology Research and Modernization.
  • Naval Architecture and Marine Engineering.

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control

Related Documents