Ship Prel Design & Feasibility Studies

Abstract

0408 - SURFTECH - Ship Development project supports the evaluation of advanced and alternative technologies through the Surface Ship Technology (SURFTECH) process for suitability for meeting total ship concepts capability needs. - OCEAN CLASS AGOR - FY10 Ship Preliminary Design and Feasibility Studies to support procurement of two AGOR ocean Class vessels in FY11 and FY12. - LCC Class Expected Service-life Assessments (ESA) - Assessments of the LCC 19 and LCC 20 will be conducted to determine life extensions. 0409 - DDG 51 FLT III Concept Development - Develop Preliminary Analysis, Testing, and Design for introduction of DDG 51 FLT III in FY16. 2474 - LSD(X) is expected to functionally replace LSD 41 class (8 ships) and LSD 49 class (4 ships) for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. Efforts are required to identify viable alternatives, including examining a reduced cost variant of LPD 17 Class. Efforts include ship concept studies, the Analysis of Alternatives (AoA), all Gate and Milestone (MS) documentation, Capabilities Development Documentation (CDD), and Preliminary/Contract Design (PD/CD). Previously LSD(X) efforts, in FY10 and FY11, were budgeted in PE 0604311N. 3226 - Green Water Craft will provide maritime security, stability operations, and increased maritime domain awareness in compliance with Global Maritime Security objectives and in direct support of Global Fleet Stations (GFS). Funding will provide for craft feasibility and sizing study and subsystem mockups in support of initial craft production. 3261 - Preliminary Ship Design and Contract efforts to support procurement of a T-AGOS Class vessel. T-AGOS ocean surveillance ships have a single mission to gather underwater acoustical data and operate to support the anti-submarine warfare mission.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2013
Source ID
0603564N_4_1319_PB_2013
Change Summary Explanation
Schedule: Reduced FY 13 LSD Design and Total Ship Integration funding based on delay in recapitalizing LSD(X). Added FY 11 funding received as part of the 2011 OMNIBUS reprogramming action to start DDG 51 flight III concept development efforts.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Acquisition
  • Contracts
  • Cost Analysis
  • Cost Estimates
  • Department Of Veterans Affairs
  • Engineering
  • Feasibility Studies
  • Maritime Domain Awareness
  • Maritime Security
  • Military Operations
  • Molecular Dynamics
  • Naval Operations
  • Procurement
  • Ships
  • Stability Operations
  • Test And Evaluation
  • Uss Arleigh Burke

Readers

  • Naval Architecture and Marine Engineering.
  • Naval Mine Countermeasure Systems Development.

Related Documents