Ship Prel Design & Feasibility Studies

Abstract

0409 - DDG 51 FLT III Concept Development - Develop Preliminary Analysis, Testing, and Design for introduction of DDG 51 FLT III in FY16. 2474 - LX(R) (formerly LSD(X)) is expected to functionally replace LSD-41 Class ships and LSD-49 Class ships for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. Efforts are required to identify viable alternatives, including examining a reduced cost variant of LPD-17 Class. Efforts include all Gate and Milestone (MS) documentation, Capabilities Development Documentation (CDD), and Indicative Design (ID). Program is on track to support FY26 retirement of LSDs. LX(R) will move to RDTEN PE 0604454N Project 2474 starting in FY15 and out. 3377 - Naval Operational Logistics Integration (OPLOG) - Develops enabling technologies for future and in-service afloat operational logistics and integrated supply systems; defines integrated combat logistics force and combatant logistics requirements; and provides a forum for cooperative initiatives of acquisition programs, program sponsors, engineering managers, the Navy science and technology community, and fleet customers. This project was previously funded in the National Defense Sealift Fund (NDSF) Appropriation (BA 04, PE 0408042N, Project 3117 Naval Operational Logistics Integration). This project in FY 2015 and later is a continuation of efforts and is not a new start. NDSF BA 04 Project 3117 prior year amounts: FY 2013: $18.170M; FY 2014: $20.024M C253 - Develop concept studies, ship design, and trade off studies in support of recapitalization of the existing T-AO 187 Fleet Oiler Class. The Navy's Combat Logistics Force (CLF) oilers supply fuel and dry cargo to Navy ships at sea. The T-AO(X) will operate as a shuttle ship from resupply ports to customer ships. Additionally, in conjunction with a T-AKE Dry Cargo/Ammunition Ship, they will accompany and stay on-station with a Carrier Strike Group (CSG) to provide fuel as required to customer ships.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2015
Source ID
0603564N_4_1319_PB_2015
Change Summary Explanation
Schedule: The Department delayed procurement of the first LX(R) from FY 2019 to FY 2020. Cost/Funding: Added funds in FY 2013 for project 2474 (LX(R)). The FY 2015 program for project 0409 was adjusted to properly phase program requirements with expenditures. Began funding Project 3377 which was previously funded in the NDSF Appropriation (BA 04 PE 0408042N, Project 3117 Naval Operational Logistics Integration). This project in FY 2015 and later is a continuation of efforts and is not a new start. Project 2474 (LX(R)) moves to new Program Element 0604454N Project 2474 (LX(R)) in FY 2015 and later. Other: Congressional action moved FY 2014 funding from NDSF (BA 04 PE 0408042N, Project 3417 Future Combat Logistics Force Development) into this PE. FY 2013 NDSF amount: $8.971M
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Acquisition
  • Contracts
  • Cost Analysis
  • Cost Estimates
  • Costs
  • Energy Conservation
  • Energy Consumption
  • Energy Management
  • Engineering
  • Logistics
  • Navy
  • Procurement
  • Ships
  • Standards
  • Systems Engineering
  • Test And Evaluation
  • Uss Arleigh Burke

Fields of Study

  • Engineering

Readers

  • Military Science and Technology Research and Modernization.
  • Naval Architecture and Marine Engineering.
  • Naval Mine Countermeasure Systems Development.

Related Documents