Advanced Surface Machinery Sys
Abstract
The Electric Ship Office (ESO) is responsible for developing and executing the Next Generation Integrated Power System (NGIPS) Technology Development Roadmap (TDR) and transition plans, as well as providing power system solution alternatives to new and existing platforms. The ESO's initial efforts are to coordinate the ongoing electric power efforts of the PEOs and Office of Naval Research, establish the technical basis and strategic direction for Naval power system architectures, develop decision making tools, and establish technical standards. This PE funds the development of specific and future electric ship technologies for all future surface ships, with the focus on integrated power systems, which provide total ship electric power, including electric propulsion, power conversion and distribution, and combat system and mission load interfaces to the electric power system.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2012
- Source ID
- 0603573N_4_1319_PB_2012
- Change Summary Explanation
- FY12: Added funds ($12.2M) to project 2471 for Tactical Energy Investments.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Integrated Power Systems (IPS)
- Child Accomplishment: IPS Component & System Development
- Child Accomplishment: IPS Component & System Test
- Child Accomplishment: Platform Transition
- Child Cost Item: 9586d4506a1bb78bc3df89b16f895ed8
- Child Cost Item: 8a4eea520ab5dc36bebe0711052b5d02
- Child Cost Item: cadd52eafc58f462392d6243d2f1db90
- Child Cost Item: da518a9daa7f87ca06e1e7e4f6304e55
- Child Cost Item: 9bfae6f0235859b7c23e97ea52619554
- Child Cost Item: 02792a16ab1d4e76d62454f089f56cc4
- Child Cost Item: 8a4cdcda4c1922ce3d0879e6a959cb12
- Child Cost Item: 06e5a9d222d3f2e0cdc0bdfd8ba821d5
- Child Cost Item: b53a32c6b20fad40c27b86c4fa2f0047
- Child Cost Item: 9a5d3a262b31ff63c0142118970e5ebd
- Child Project: Congressional Adds