Advanced Surface Machinery Sys
Abstract
This Program Element (PE) supports innovative research and development of advanced surface ship Hull, Mechanical, and Electrical (HM&E) components and systems, primarily power and energy systems, and the subsequent test, evaluation, and demonstration of those systems for future ships and back-fit ships, where appropriate. This PE provides resources for Ships HM&E cyber analysis. This PE also serves as the bridge for power and energy systems between Science and Technology (S&T), ship platform, and mission systems acquisition programs by identifying prospective applications for S&T research, advanced development, and performing additional product development and qualification when necessary to meet platform or mission system requirements. This PE includes risk mitigation efforts for the DDG(X) Integrated Power System (IPS) which will satisfy the FY20 National Defense Authorization Act (NDAA) Section 131 requirements for land-based testing of propulsion systems in a realistic environment and FY22 NDAA Section 221 requirement for a land based test program for the engineering plant prior to DDG(X) construction start. The IPS hardware development and procurement and Land Based Test Site (LBTS) integration and test efforts executed under this PE / PU are informed by DDG (X) Ship Design specifications developed under PE 0603564N / PU 0411. Lower funding requirements in FY 2024 is due to completed procurements of lead-time hardware for DDG(X) Integrated Power System (IPS) Land Based Test Site (LBTS) and an increase in enacted funding levels in FY23.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2024
- Source ID
- 0603573N_4_1319_PB_2024
- Change Summary Explanation
- FY 2023 to FY 2024 decreased by (-73.089) million of which (-$30.400) million is due to FY23 Congressional Adds, as well as the following decreases to PU 2471/ Integrated Power Systems budget: (-$32.741M) due primarily to DDG(X) Integrated Power System (IPS) Land Based Test Site (LBTS) progressing through long lead time hardware procurements; (-$3.638M) is associated with delivery of the EM-P unit in FY23 and completion of government testing in FY24 and; (-$ 6.310M) due to realignment of SABER development funds to the SABER program office PE 0603563N project 3244. R-4 Schedule update for HM&E Cyber Analysis. Efforts that remain in this PE are as needed Tabletop exercises that do not have specific milestones.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Integrated Power Systems (IPS)
- Child Accomplishment: DDG (X) Power & Propulsion Risk Mitigation & Demonstration
- Child Accomplishment: Power and Energy Systems
- Child Accomplishment: HM&E Cyber Analysis
- Child Cost Item: 76091959514a5da6076d2eb3621905fa
- Child Cost Item: 1da0af547c8b83b05937d102512e5a88
- Child Cost Item: ad473fa23b2b6093158ebd755db49f5d
- Child Cost Item: 075d3640092378047a467b3016e39964
- Child Cost Item: adaf0f7e6c18eba876861ce37a192bdb
- Child Cost Item: 5acf46d50a292ddaf334bb0e689bbf47
- Child Cost Item: d87d074f061b6e11b2c96c34ae5beab2
- Child Cost Item: ecc7db689f3386ac65f43e0b913b7df3
- Child Cost Item: 7b24505c5392b5f4cb5e6dd97b5a2627
- Child Cost Item: 2989e8cb113eba8fb759302fa66607ca
- Child Cost Item: 8c7a7848d12f3ef1da6e9a191b6bfea3
- Child Cost Item: b5fa1d864c70e6ccf6512b5a2474e3f6
- Child Cost Item: 06bd9bd807013e4e2477aeeed86b8e94
- Child Cost Item: 5f828699c28babedd4e633f62a5daede
- Child Cost Item: 9165d948fb0baef575707a113abdf478
- Child Cost Item: 8e2b01c3f233faa1eea04f9ea80ed64f
- Child Cost Item: bf89b4a4ba3370abe04638af4b45ecce
- Child Cost Item: a1af17fcc5751c8f1f559f83623e7934
- Child Cost Item: bbc6459aa7023ef2ba5ca83c83f94b63
- Child Cost Item: 211327066ae5e0353a4a0face8aa24b9
- Child Cost Item: 07bee2226d024bea7fac329337e3413d
- Child Project: Congressional Adds
- Child Cost Item: 399da1a4f05e24569ce3de3d3148bdbb
- Child Cost Item: dd2b9855f5552ca88b83616d7d680ea8
- Child Cost Item: b7249579ac2634a5f0a126f147a498bf
- Child Cost Item: 155e712442189b01218859172e98350c
- Child Cost Item: 7de311350a05edc8cc37007def6da205
- Child Cost Item: b72fefde8d0e3a8e0e62ce4470061da2
- Child Cost Item: 7b3c9b4e543e9ac883fc93e590079ae9
- Child Cost Item: ed222305b52a6d44c57581a7a4cc4659
- Child Cost Item: e21284923bbbd944fe115ac580f5d6c7
- Child Cost Item: aca376887876ed6dc2517586cdf6d0c1
- Child Cost Item: 4bad4b6b2c9062e2eca32a83105e7fcc
- Child Cost Item: 8ffc380409d25b2cfdc9aaf0b663e807