Armored System Modernization - Adv Dev

Abstract

This funding line is directly aligned to the Next Generation Combat Vehicle (NGCV) Army Modernization Priority. Armored System Modernization Advanced Development provides maturation of emerging Science and Technology (S&T) and industry technologies for potential integration to ground combat vehicles. The purpose of this Program Element's (PE) funding is to demonstrate new capabilities to meet current and future military needs and to determine integration potential across the Army portfolio of ground combat vehicles by testing and evaluating a variety of technologies. The total cost of the RCV(L) MTA Rapid Prototyping program is $452.77 million (then-year dollars) RDT&E from FY 2022 to FY 2026. The RCV(L) MTA Rapid Prototyping program is fully funded across the Future Years Defense Program.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2023
Source ID
0603645A_4_2040_PB_2023
Change Summary Explanation
FY 2023 funding increase reflects the fact that the FY 2022 President's Budget request did not include out-year funding.
Service Agency Name
Army

Entities

Organizations

  • United States Army

Tags

Communities of Interest

  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Combat Vehicles
  • Electric Vehicles
  • Emerging Technology
  • Engineering
  • Ground Control Stations
  • Ground Vehicles
  • High Voltage
  • Hybrid Electric Vehicles
  • Manufacturing
  • Product Prototyping
  • Production
  • Program Management
  • Software Prototyping
  • Target Recognition
  • Test And Evaluation
  • Test Facilities
  • Unmanned Aerial Systems

Readers

  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Life Cycle Cost Analysis
  • Military Science and Technology Research and Modernization.

Related Documents