WARFIGHTER INFORMATION NETWORK-TACTICAL - DEM/VAL
Abstract
The Defense Acquisition Executive (DAE), through the Nunn-McCurdy certification process, certified a restructured WIN-T program on June 5, 2007. The certification Acquisition Decision Memorandum (ADM) stated that the Army will restructure the WIN-T Major Defense Acquisition Program (MDAP) to absorb the former Joint Network Node (JNN) Network program. It further stated that the restructured program will consist of four Increments: Inc 1, Inc 2, Inc 3, and Inc 4. WIN-T is key to the Army's Network Modernization program. The WIN-T program's focus is to design, develop, produce and field the Future Modular Force transport network, while leveraging mature technologies that can enhance the Current Modular Force to operate in an emerging noncontiguous environment. FY12 funding in support of Inc 2 provides government test support for New Equipment Training, Cold Region Test, Force Development Test/Experimentation (FD/T), Initial Operational Test (IOT), as well as the support required for the Full Rate Production Decision Review. FY12 funding in support of Inc 3 continues the Inc 3 System Development and Demonstration contract to include software development engineering builds, continued development of Inc 3 mature technologies that will be inserted into Inc 2, development of an aerial tier, as well as continuing the objective transmission subsystem; JC4ISR radio and associated antennas and the Transmission Subsystem Critical Design Review (TSS CDR) to support the Inc 3 engineering and manufacturing development phase.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2012
- Source ID
- 0603782A_4_2040_PB_2012
- Change Summary Explanation
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: WIN-T INCREMENT 2 -INITIAL NETWORKING-ON-THE-MOVE
- Child Accomplishment: Test and Evaluation
- Child Accomplishment: Support Cost
- Child Accomplishment: Management Services
- Child Cost Item: 16d40448b21d8cee6032b0a794536b4a
- Child Cost Item: ecdf43746476f7b2749bc8ee3d3d9bce
- Child Cost Item: e7f005dbbb701fcf57000bfea8de58ae
- Child Cost Item: 7716a2824dca953a73a1fe1e31e6617a
- Child Cost Item: c1a6a30895a1e12185c1c6d2c1dc5201
- Child Project: WIN-T INCREMENT 3 - FULL NETWORKING ON THE MOVE
- Child Accomplishment: Product Development
- Child Accomplishment: Support Cost
- Child Accomplishment: Test and Evaluation
- Child Accomplishment: Management Services
- Child Cost Item: 7600263129bdcb6fab3e0f822b122574
- Child Cost Item: 3dc99eb1c6bb1e0b2dbe9a7d94deecc5
- Child Cost Item: b126e24566e0a3dde0758bc072d854f6
- Child Cost Item: 67322bb3663498627f9385e1d35b02d3
- Child Cost Item: 2b47f27d50c8c93a27eeccf9d57feb33