JT Precision Approach & Ldg Sys
Abstract
This program element provides for the development, integration, and testing of the Joint Precision Approach and Landing System (JPALS), which will be applicable to Department of Defense (DoD) Ground systems, DoD aircraft, and Navy and Coast Guard air capable surface ships. JPALS will provide a rapidly deployable, adverse weather, adverse terrain, day-night precision approach and landing capability. Operating environments include fixed or permanent ground facilities, tactical facilities, and shipboard. JPALS will be interoperable with civil landing systems. The JPALS program was established in response to the Joint Mission Needs Statement (MNS) for Precision Approach and Landing Capability (PALC), which was approved by the Chief of Naval Operations on 28 July 1994 and the Chief of Staff of the Air Force on 8 August 1994. The PALC MNS was validated by the Joint Requirements Oversight Council (JROC) on 29 August 1995. Army Joint Service participation was included in the 28 May 1996 Principal Deputy Under Secretary of Defense (Acquisition and Technology) Milestone 0 Acquisition Decision Memorandum, which also designated the Air Force as the Lead Service. In March 2004, the JPALS Overarching Integrated Program Team determined that the MNS should be converted to an Initial Capabilities Document (ICD). The JPALS ICD was approved by the JROC on 19 September 2005. On 16 March 2007 JROCM approved the JPALS Capability Development Document and designated the Navy as the Lead Service. The Analysis of Alternatives was finalized in 3Q FY2007. Milestone B was met 14 July 2008. At Milestone B, the Milestone Decision Authority separated Increment 1 into Inc 1A and Inc 1B.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2013
- Source ID
- 0603860N_4_1319_PB_2013
- Change Summary Explanation
- Technical: Not applicable. Schedule: JPALS Inc 1A project schedule updated to reflect actual EDM deliveries in first quarter FY2011. MS C moved from 2nd quarter 2013 to 3rd quarter 2013 to accommodate a slide to CVN-77 availability for integrated test window. Project 3228 changed to include further breakdown of technical events, SRR 2 & SFR. JPALS Inc 1B project schedule updated to reflect delay in MS B (4 months). Financial: Reduced FY 13 funding to properly phase planned execution.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: JPALS
- Child Accomplishment: JPALS Engineering and Manufacturing Development (EMD) Increment 1A - Shipboard
- Child Accomplishment: JPALS EMD Increment 1A - AIG
- Child Cost Item: 41f4bd5deaf573799ccfb857139aa063
- Child Cost Item: 640f7763e8a54cc5279211f1d5f39d71
- Child Cost Item: b6bc7debf550a555f8cad1dca95cb6b7
- Child Cost Item: 5b8c3829479375282b4aa67ab7bc8119
- Child Cost Item: 5d7e9dfd2c58988ab81b96fcc6d740e4
- Child Cost Item: 525dd889af77fb2b0b117f2d5c9b1922
- Child Cost Item: b691735c361e6f3a7b9864afb15d3bbf
- Child Cost Item: 068b8d69e172eb3df5f55045bad1c38a
- Child Cost Item: 2e04c58e450f0e180c583770722d11e8
- Child Cost Item: 89d5116ed1b261f17340de95e1f705ce
- Child Cost Item: 430760ae97af223d700fa7df0cc35e32
- Child Cost Item: a14c3772822133818c86ce144275dd1e
- Child Cost Item: ab6547455018a9fefbe680754520ee18
- Child Cost Item: 04ed1dc4e3ff3e3971888944a4aac838
- Child Cost Item: f3fbbd868b00afbd686c4a2a80590b7d
- Child Cost Item: 6e0cb00c45bfb3bd1d1f4635c0ee9747
- Child Cost Item: 5700975ec71157e74f3aa7a3de48d8a1
- Child Cost Item: d52b2fe6095bf325b4d7cbe7b254961a
- Child Cost Item: 9b14c809581640f75b4a367557062c84
- Child Cost Item: 265f36ea5ab41ee9224448c754ee963a
- Child Cost Item: ac65930fd6c466b0bbd822484fa52c8d
- Child Cost Item: 6120db93f6b0f68f7522be82a63fb53b
- Child Cost Item: 187f9b07beea96947600b5eed8dd0bd3
- Child Project: JPALS 1B
- Child Accomplishment: Lead Platform Integration
- Child Accomplishment: Follow-on Platform Integration
- Child Cost Item: a31a3e2547d211bf48fed1dc6ca9cbec
- Child Cost Item: 01fabbf2326b5042050f6292a291dbaf
- Child Cost Item: 3bacf748ba0f82913d29554ae777f614
- Child Cost Item: 6396bab291fb9590fb01f7e6da0c0684
- Child Cost Item: fe9dfd27a62498b7af71e1181fdb74f5
- Child Cost Item: ab8ff849bf6c10e683fb171b9c9879a4
- Child Cost Item: 5214af6a425bbcb91dea857094513c53
- Child Cost Item: 3f4aa3c65357dc8ad39862f223909122
- Child Cost Item: 355df860c55aa7467fdaf66c8efa9756
- Child Cost Item: 9ece706d26bedeeab9e2ac340b28c768
- Child Cost Item: 0056c7d90e8d6767a83ed179e11d8743
- Child Cost Item: b5760402e27ed58610651c9ac69edd3f
- Child Cost Item: 2b27352fb65c503d17b9e37ce8e8b34e
- Child Cost Item: 89d14519b2072bcee2efbf5cf6219014
- Child Cost Item: 7e7116a8f7c55b756386bb0a5a89207a
- Child Cost Item: fdcf80eb6512e2593c6b54d0c48f264d
- Child Cost Item: 7a0b7ad79e164cd2cf1d34b406e79621
- Child Cost Item: 4e296d4322bf7756b9d605568272452e