GERALD R FORD CI NUC AIRCRAFT CARRIER CVN 78-80

Abstract

The FY 2022 funding request was reduced by $0.361 million to account for the availability of prior year execution balances. This Navy program addresses unique technologies on Ford Class carriers. The program includes: - (2208) - Development of ship hull, mechanical, propulsion, electrical, aviation, and combat support systems, subsystems and components to significantly improve aircraft carrier affordability, manpower requirements, survivability, and operational capabilities, and to meet the requirements of existing and pending regulations and statutes critical to the operation of existing and future aircraft carriers. - (4004) - Development of an advanced technology aircraft launch system in support of the CVN 78 Class design and construction schedule. The Electro Magnetic Aircraft Launch System (EMALS) will replace the current steam catapult on CVN 78 Class ships. EMALS provides better control of applied forces, both peak and transient dynamic, improved reliability and maintainability, increased operational availability and reduced operator and maintainer workload. - (9999) - Development of a CVN electronic personnel qualification standards system (EPQS). This Program Element (PE) and associated projects represent a continuation of efforts previously funded under PE 0603512N projects 2208 and 4004 in FY 2014 and earlier.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2022
Source ID
0604112N_4_1319_PB_2022
Change Summary Explanation
Schedule: 4004 EMALS Technical: N/A Cost: The increase from FY2021 to FY2022 supports the stand up of the EMALS Depot Facility (Phase 1). Schedule: Updates include the following: - CVN78/CVN79/CVN80: Events were updated to reflect the most current Post Delivery Test & Trials (PDT&T) ship schedule. EMALS Milestone: - MS D was removed from the schedule. Correction of Deficiency (COD) NRE/Software Development: - Moved from 2Q FY2021 to 1Q FY2022 Fleet Interim Training end date moved from 4Q FY2021 to 4Q FY2022 Training Curriculum Development CNATT Approval end date is 2Q FT2021 Depot Planning Depot Facility Standup start date moved from ending in 1Q FY 2022 to 4Q FY 2022 Phased Depot Stand-Up (Component and Overhaul) starts 2Q 2022 Included AAG production schedules and Builds plan for CVN79/CVN80/CVN81 Included Sustainment for Engineering Change Proposal and E22 Build Cost: 2208 CVN Addition of Full Ship Shock Trials (FSST) Analysis, Reports and Repairs (+12.000M) Program Adjustments (-1.761M) 4004 EMALS The $13.000M increase from FY 2021 to FY 2022 supports the stand up of the EMALS Depot Facility (Phase 1).
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Air Platforms
  • Cyber
  • Ground and Sea Platforms
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Aircraft Carriers
  • Catapult-Assisted Takeoff Systems
  • Combat Support
  • Contracts
  • Cost Analysis
  • Data Analysis
  • Electromagnetic Aircraft Launch Systems
  • Ford-Class
  • Logistics
  • Maintenance
  • Nimitz-Class
  • Procurement
  • Product Development
  • Shipbuilding
  • Tablet Computers
  • Test And Evaluation
  • Uss Gerald R. Ford

Readers

  • Maritime and Naval Warfare Studies
  • Military Logistics and Supply Chain Management
  • Military Science and Technology Research and Modernization.

Technology Areas

  • Microelectronics
  • Microelectronics - Microelectromechanical Systems

Related Documents