GERALD R FORD CI NUC AIRCRAFT CARRIER CVN 78-80
Abstract
This Navy program addresses unique technologies on Ford Class carriers. The program includes: - (2208) - Development of ship hull, mechanical, propulsion, electrical, aviation, and combat support systems, subsystems and components to significantly improve aircraft carrier affordability, manpower requirements, survivability, and operational capabilities, and to meet the requirements of existing and pending regulations and statutes critical to the operation of existing and future aircraft carriers. - (4004) - Development of an advanced technology aircraft launch system in support of the CVN 78 Class design and construction schedule. The Electro Magnetic Aircraft Launch System (EMALS) will replace the current steam catapult on CVN 78 Class ships. EMALS provides better control of applied forces, both peak and transient dynamic, improved reliability and maintainability, increased operational availability and reduced operator and maintainer workload. This Program Element (PE) and associated projects represent a continuation of efforts previously funded under PE 0603512N projects 2208 and 4004 in FY 2014 and earlier. Project Unit (PU) 2208 now includes PUs 3179, 3108 and 4007 in FY 2024 and later, which are a continuation of efforts previously funded under Program Element (PE) 0604567N. Navy consolidated all Ford Class project units into one program element for improved transparency of all R&D efforts associated with the CVN 78 Class.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2024
- Source ID
- 0604112N_4_1319_PB_2024
- Change Summary Explanation
- 2208 CVN 21 Cost: FY24 PROJ PU 2208: Addition of PUs 3179, 3108 and 4007 in FY 2024 and later from PE 0604567N (+$40.1M) FY24 PROJ PU 2208: Added additional funds for Integrated Digital Shipbuilding (iDS) (+$20.0M) FY24 PROJ PU 2208: Added additional funds for CVN 78 Class Developmental Testing (DT) / Operational Testing (OT) (+$15.3M) 4004 EMALS Cost: Program adjustments (-$1.9M) Technical: N/A Schedule: Integrated Test & Evaluation (IT&E) end date moved from 1Q FY2022 to 2Q FY2022 to complete the top system safety issue for EMALS Block Switch Sensor (BSS), which was identified during CVN78 Post Delivery Test & Trials (PDT&T). Phased Depot Standup (Component & Overhaul) moved from Development to Sustainment. Depot Planning/Logistics Dev end date moved from 3Q 2023 to 1Q 2024 to include Depot Overhaul Capability efforts. Added Automated Software Testing in 1Q FY2024 through 4Q FY2026. Added Electrical Isolation Development starting 1Q FY2025 through 4Q FY2027. CVN 79 events were updated to reflect the most current Post Delivery Test & Trials (PDT&T) ship schedule.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: CVN 21
- Child Accomplishment: CVN 78 Class Digital Transformation
- Child Accomplishment: CVN 78 Class Test & Evaluation (T&E)
- Child Accomplishment: CVN 78 Class Transformation and Affordability
- Child Accomplishment: CVN 78 Class Systems Analysis & Total Ship Integration
- Child Accomplishment: CVN 78 Full Ship Shock Trial (FSST)
- Child Accomplishment: CVN 78 Class Advanced Technology Design & Development
- Child Cost Item: 859cb294ff1ffa6ab2975b37fd5c035d
- Child Cost Item: aa23b32c3a6e5a8cbe850b56dad5fd57
- Child Cost Item: a49b2c7e1cbf004a062df6052e9af1a3
- Child Cost Item: 297e8a220f4a60c7b20f947ba6b325d6
- Child Cost Item: 46043454a262a54b3f7bbad4980d54ff
- Child Cost Item: 228009b43977b6095b2a979cc58c822e
- Child Cost Item: 1c40410146e55b5ce5fa317c937184ec
- Child Cost Item: e12c0192e99c1533b65efe38624b6fdd
- Child Cost Item: cb9450852ad92c9d5c5bd45892287a35
- Child Cost Item: 1c18a00eb86be2ffdd5ff4f610555076
- Child Cost Item: ec575a49fc6875d421433dcf69b4e3ce
- Child Cost Item: a9522e88ab9b235573259f2cf09176c7
- Child Cost Item: eecf78c931e55b7aed07b28fa86055f2
- Child Cost Item: 3aadc3e62845519b2c0d72561fdce5d4
- Child Cost Item: 69836eb344d56955494edd85f12859f9
- Child Cost Item: da55ee80b1e70fd23afc7778efd4a054
- Child Cost Item: f99e0173ac6b6a129989e3ffffc0d50c
- Child Cost Item: 7f0fae9d2f37f95ea0850dcefa4c070e
- Child Cost Item: 0ae1736ddd2a6335d2e531ae14b3fa85
- Child Cost Item: 2005603da5aa7b0e35701a44aaa8b7fa
- Child Cost Item: 89a680cdcb3a1318527a09d16c887c98
- Child Cost Item: 3af700cbf91a2ec8bc6b3454906783c5
- Child Cost Item: 46b551b346e0d4930a2fdfba476de6dd
- Child Cost Item: 4a4de1979485f1cd696c1ded8acfa3c9
- Child Cost Item: c9b494c1b76ffcdd5dabeba2f555e114
- Child Cost Item: 3bca192d5e73094f602efe219c4c8757
- Child Cost Item: 2389f8ddf5fc9277e4630733792d72bd
- Child Cost Item: ea00251fd5aa200acbc6e114356f0142
- Child Cost Item: b6d9bd86cef1da6332cdc251ec20a3b4
- Child Cost Item: 268bd46cacd28a59422d6827375fe70a
- Child Cost Item: 1ea31b68fca6d1b1f779eefaa560d22c
- Child Cost Item: f11c56d36de42607742d49275a09ac25
- Child Cost Item: 3f619b1d773c8989bf426e6cfa396127
- Child Cost Item: 87a11f8b69517bd92b0f45a0aba98294
- Child Cost Item: 217b0a417464a31783aa09b7de3f95d6
- Child Cost Item: d4307f9fb9b2ac45fedc2a827a986777
- Child Project: EMALS
- Child Accomplishment: EMALS
- Child Cost Item: 000260b398e0e35be675430885b9b166
- Child Cost Item: 8362cd58462d3c04fba8e916df60e596
- Child Cost Item: af00ac210f43e97c0693cd1ea9f28246
- Child Cost Item: 2ea67abbfcb79c37c1113c83164beed6
- Child Cost Item: f7866059c252baa2fda0a21f38d2c257
- Child Cost Item: a3df8bb2cbd88501e78bd481f2e44087
- Child Cost Item: 345cbc76756e196e1f3cc50d50ada11a
- Child Cost Item: 2ca6b490c4f6389a878d3f44517659a7
- Child Cost Item: 8abc09c5d35aaef596dda3c489e8ff56
- Child Cost Item: 91cb429ea1e7f7cc0e6f01783e9311d4