Assured Positioning, Navigation and Timing (PNT)
Abstract
Assured Positioning, Navigation and Timing (A-PNT) provides Army ground maneuver forces access to assured PNT information under conditions where space-based PNT Global Positioning System (GPS) may be limited or denied (jammed and spoofed). A-PNT products are ruggedized tactical systems that enable Army forces at echelon the ability to shoot, move, communicate, and protect their forces to penetrate and dis-integrate enemy anti-access systems, thereby allowing them to maneuver from operational and strategic distances to close with, destroy, and exploit the enemy in close and deep maneuver areas with sufficient combat power, tempo, and momentum. A-PNT addresses two critical capability gaps: Access and Integrity. Access is the ability to retrieve accurate PNT information in a contested Electronic Warfare/Cyber environment. Integrity is the ability to trust the PNT information. PNT is a critical enabler of many Army Maneuver, Fires, and Command and Control systems that are dependent on accurate Position and Timing, and a foundational Multi-Domain Battle capability to support: calibrated force posture (position and maneuver across strategic distances); multi-domain formations (operate in contested spaces against near-peer adversaries); convergence (continuous integration of capabilities in all domains). The current Global Positioning System (GPS) capability is a fixed frequency system susceptible to electronic warfare and field environments (e.g. urban, dense vegetation). Joint Requirements Oversight Council Memo (JROCM) 049-10, dated 05 April 2010, approved the PNT Assurance Initial Capabilities Document and designated the Army as the Lead Component for Assured PNT. Army Futures Command approved the Mounted A-PNT System (MAPS) Directed Requirement (DR) on 13 January 2019. The Dismounted A-PNT System (DAPS) Directed Requirement was approved 05 April 2019. The Alternative Navigation (ALTNAV) Directed Requirement was approved in November 2019. MAPS transitions to a Capability Development Document (CDD) in June 2020 and DAPS transitions in FY 2021. A-PNT consists of four Projects; (BV4) Area Protection and Alternative Navigation (Alt Nav) Technology Development, (ED5) Assured PNT, (EH8) Dismounted A-PNT System (DAPS), and (EJ2) Mounted A-PNT System (MAPS). Project Manager (PM) PNT manages these four Project areas (Area Protection and Alt Nav capabilities, Assured PNT, DAPS, and MAPS) constructed to investigate, prototype, experiment, model, assess, develop, modify, improve resiliency, test, equip, field, and sustain A-PNT solutions. Assured Positioning, Navigation and Timing (A-PNT) consists of: (BV4) - The Area Protection and Alt Nav Technology Development project supports the transition of technologies from industry, academia, and government Science & Technology organizations, and consequent development of alternative and complementary PNT technologies for integration into Mounted A-PNT System (MAPS) and Dismounted A-PNT System (DAPS). Area Protection & Alt Nav Technologies will be developed in order to demonstrate Alternative Navigation (ALTNAV), emerging complementary PNT, and net-enabled GPS solutions to provide Radio Frequency (RF) and non-RF threat mitigation. (ED5) - The Assured PNT project funding line is for Resiliency and Software Assurance Measures (RSAM) software upgrades to legacy military GPS receivers. This line also supports the completion of network integration, installation and testing of ALTNAV signal enterprise build-out. (EH8) - The Dismounted A-PNT System (DAPS) will provide the Soldiers equipped with Nett Warrior and other Soldier architecture compliant systems (e.g. Integrated Visual Augmentation System (IVAS)) conducting operations outside of vehicles, unhindered access the critical timing and position data to effectively engage targets, share data across the network and conduct mission command functions. (EJ2) - The Mounted A-PNT System (MAPS) is a platform-mounted, ruggedized tactical PNT system which provides electronic protection capabilities that provide Army forces the ability to move, shoot, communicate, and provide situational awareness in Global Positioning System (GPS) challenged or denied environments. Included in the MAPS is the Anti-Jam Antenna System (AJAS) which provides GPS signal point protection and PNT Assurance in challenged environments through Anti-Jam, non-Radio Frequency, and alternate navigation technologies. AJAS enables tactical capabilities through assured signal acquisition in challenged environments. The AJAS will assist in delivering distributed assured PNT capabilities to mounted platforms over time in an iterative, affordable manner that allows for future modernization.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2021
- Source ID
- 0604120A_4_2040_PB_2021
- Change Summary Explanation
- Program Element (PE) 0604120A restructured from PE1206120A in FY 2021.
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: Area Protection and Alt Nav Technology Development
- Child Accomplishment: Area Protection & Alt Nav Technology Development
- Child Cost Item: e1e5ff48d60b73eced6010df38f6d0fa
- Child Cost Item: 38fbe5971f40de880988ac782c543f7b
- Child Cost Item: 6d94e6d5298212c194986d0afb6a29f0
- Child Cost Item: 8d3ae222bd587355205123386ab9407c
- Child Cost Item: a11fb6494603526c93fd80eef2db7539
- Child Cost Item: d2bd9bece75a986973fac9827783492f
- Child Cost Item: ecc87ab4da63e246adc57e25bf15b132
- Child Project: Assured Positioning, Navigation and Timing (PNT)
- Child Accomplishment: Resiliency and Software Assurance Measures (RSAM)
- Child Accomplishment: Assured PNT Enablers
- Child Cost Item: 5717570f3990d34d2f73a46b308c014e
- Child Cost Item: 3941ddb81f45791499338b973f87368c
- Child Cost Item: dac27d20d558db7c95158bc4a774f458
- Child Cost Item: 9b8cdb2e9f4030d84d80145d9d3e0187
- Child Cost Item: 366b0360a9b3f987c93897b7caee79e4
- Child Cost Item: 076b1b5edf9baf2e810cb7e298b58ef6
- Child Cost Item: 8c3a48d11497605890264aefee40848a
- Child Cost Item: b59e15e67360557f162753f8b4bdad34
- Child Cost Item: 99b6cf5cd40ce617287be484594ac480
- Child Cost Item: 31089065a4cc3aa15b530d1a8639c752
- Child Cost Item: 81a7fa901ddeb4783ace9020ef1c9fe5
- Child Project: DISMOUNTED
- Child Accomplishment: Dismounted A-PNT System (DAPS)
- Child Cost Item: 7d6dfd5c95eae97283099c764f7509ea
- Child Cost Item: 898cb9c523e05f135c1ac17d697f3c8e
- Child Cost Item: 38cd100c2b9980e1fc1cf53f8cd429e2
- Child Cost Item: e8e714bf3ab628607f5ba5b9ccf3bac8
- Child Cost Item: 3cfb7c86ee09c44aff0e4bbd83e9f45b
- Child Cost Item: be8f9babf080885365e5f42ac4ef2fd0
- Child Project: MOUNTED
- Child Accomplishment: Mounted A-PNT System (MAPS)
- Child Cost Item: 94aaed92a88baa3b971e00cdd1a550b2
- Child Cost Item: e650c904b44e509aaae0995bcdb48e7b
- Child Cost Item: 2703ee87a553c144d5355bd61f66297e
- Child Cost Item: cc4365786042366369b43db40eacc025
- Child Cost Item: 9a6da960688e9dfaa0eeb48cc2fd6caf
- Child Cost Item: 541f13c730341277759fe37aaf779c59
- Child Cost Item: 04de69201cf3124624b91c4e99154b83
- Child Cost Item: fdf9396fcf780a9187525b5f49091985
- Child Cost Item: 914f043d7998edab6782c3f1f3f70696
- Child Cost Item: 58c7b53eb67bd6c9947bf2e9ec81e6e8
- Child Cost Item: 1a9c831003542abb05f0634d4fe54462