Other Helicopter Development
Abstract
This Program Element includes funding for the development support for improvements to current systems for CH/MH-53 and new development of Attack and Utility Replacement Aircraft (AURA) capability. The H-53 is the premier heavy lift helicopter for the Marine Corps and the only operational airborne mine sweeping platform for the Navy. H-53 RDT&E efforts focus on trade studies and risk reduction measures to identify candidate survivability, safety, avionics, cargo handling, cockpit and other airframe specific improvements to extend the service life. AURA is a Joint Department initiative to address vertical lift capability requirements and determine feasible and affordable solutions in support of the Joint Warfighter.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2022
- Source ID
- 0604212N_5_1319_PB_2022
- Change Summary Explanation
- Cost/Technical/Schedule: 1109: FY 2022 budget request was reduced by $0.661M since the FY 2021 President's Budget submission to account for the availability of prior year execution balances and $0.120M for miscellaneous rate adjustments. 3406 Attack and Utility Replacement Aircraft: Cost: FY 2022 reduction of $27.795M since the FY 2021 President's Budget Submission is associated with USMC Force Design guidance ($27.064M), Navy Working Capital Fund rate adjustments($0.117M), and Rate Adjustments ($0.614M). Schedule: Request For Proposal (RFP) Decision, Technology and Risk Reduction (TMRR), and Modular Open Systems Approach (MOSA) Other Transaction Authority (OTA) shifted due to the recent Force Design effort conducted by the USMC. University Affiliated Research Center (UARC) Studies were extended to accommodate increased scope to address reliability and maintainability aspects of the study.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: CH/MH-53
- Child Accomplishment: H-53 Avionics
- Child Accomplishment: H-53 Survivability
- Child Accomplishment: H-53 Propulsion
- Child Accomplishment: Project Management Support
- Child Accomplishment: H-53 Airframe
- Child Accomplishment: APR-39D(V)2
- Child Cost Item: f2890e28ad6c1bde01c6044863193fe5
- Child Cost Item: a860dc734c46ca0ef30f5e71e8030126
- Child Cost Item: ffb3e13c083023778ce93ea774631b15
- Child Cost Item: 49e2073ad00828c7986cfaca3bae3878
- Child Cost Item: 85a9c9e29473347067e8ab9b2129ca6e
- Child Cost Item: 69bd349b4b4a7bb050886b194c537057
- Child Cost Item: ab4e834a1920e4eee319de1d08fe648f
- Child Cost Item: bc935f55254983d17e2d1238de7cc40a
- Child Cost Item: a8caac2a8babf00be7cce7794158bd89
- Child Cost Item: 50378633d7d9c99854a64c2d035712f2
- Child Cost Item: f50feea3f6a1be17965348a5ab8c0869
- Child Project: Attack and Utility Replacement Aircraft
- Child Accomplishment: Attack and Utility Replacement Aircraft
- Child Cost Item: 4e6893cd2000344d198c33b0a0e8187a
- Child Cost Item: 0e18f67e4ff02d29fd4222914acb6632
- Child Cost Item: 8cdb7d207844608ddc13c1f038eacf29
- Child Cost Item: c5abe1d1141ce6bc5e96b64d5198b447
- Child Cost Item: 3915993192f89629ebdc0378283bc5ed
- Child Cost Item: 9c5e6303146f186ebe6b35b1c41f4008
- Child Cost Item: aeb7d733aefe9cd035794e9cbc841f9b
- Child Cost Item: b774bad2d917755309b71014232aebf2
- Child Cost Item: 281d5044f8606cf7faa0d49cf01b7cbf
- Child Cost Item: 3169238b5c3115666ec6f449d5fd42d0
- Child Cost Item: b4c537b81ca9cfee269989abd98c409b
- Child Project: Congressional Adds
- Child Cost Item: 3258259ae28185ec5380f3df96c75091
- Child Cost Item: b0e21afad71c704a07e3f596dee9d7b3
- Child Cost Item: db553066b8fcef5f7a0ccd1dd1f129fc
- Child Cost Item: a902f468173f8a72f22b6ea762c8d942