Standards Development

Abstract

This project provides for the identification, study, design, development, demonstration, test, evaluation, and qualification of standard avionics capabilities for Navy use, and wherever practicable, use across all Services and Foreign Military Sales. Such air combat electronics developments include communications and airborne networking, navigation and sensors, flight avionics, safety systems, and flight mission information systems for both forward fit and retrofit aircraft. These efforts continue to maintain federated systems while encouraging transition of procurements to support a modular system for enhanced performance and affordability. Consideration is given up front to reduce acquisition costs through larger procurement quantities that satisfy multi-aircraft customer requirements and that reduce life cycle costs in the areas of reliability, maintainability, and training. This project also provides a Navy-wide program to develop required calibration standards (hardware) in all major measurement technology areas in support of Navy Hull, Mechanical and Electrical (HM&E) systems as well as Navy Weapons systems, ground and air, throughout the Fleet. It funds Navy lead-service responsibilities in the DOD and Joint Services Metrology Research and Development program. This project supports the military requirement to verify the performance of all test systems used to validate the operation of Navy Hull, Mechanical and Electrical (HM&E) as well as Navy Weapon Systems with calibration standards traceable to the National Institute of Standards and Technology.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2011
Source ID
0604215N_5_1319_PB_2011
Change Summary Explanation
Technical: Not applicable. Schedule: 0572: AMCD-Upon completion of the V-22 Mission System Upgrade (MSU) Risk Reduction activity, follow-on MSU development effort cancelled. Remaining activity includes the conduct of Trade Studies for the Fiber Channel Network Switch (FCNS), Network Processor and OSP3e upgrades to meet future Naval Aviation requirements. TACCOM-Moved NSA Certification for Gen5 Design Reviews/Certifications from 4th Qtr FY09 to 2nd Qtr FY10 and Production Starts from 3rd Qtr FY10 to 4th Qtr FY10 to reflect fact of life schedule delays brought on by changing NSA security requirements to maintain radio CCI classification. GPWS-MV-22 GPWS efforts were delayed. Moved from 1st Qtr FY09-4th Qtr FY10 to 3rd Qtr FY11-4th Qtr FY13. MFOQA-Milestone C moved from 4Q09 to 4Q11 and IOC moved from 1Q10 to 2Q12 due to fleet requirements changes to address security, access control, expanding data trending/analysis capability, and speed of application across all squadron and enterprise users. F/A-18 Lead Platform Schedule change resulted from a change in MFOQA Program Baseline Requirements. MH-60/R/S/CH-53 Platform Schedule change resulted from a change in MFOQA Program Baseline Requirements. T-45 Platform Schedule change resulted from a change in MFOQA Program Baseline Requirements. All follow-on program efforts were delayed due to this change in the Baseline Platform Schedule. COLLABORATIVE WARFARE - Collaborative Warfare efforts were delayed due to FY10 new start and operating under a CRA. Warfighting Gap Analysis moved from 1st Qtr FY10 to 2nd Qtr FY10. Candidate Solution ID moved from 2nd Qtr FY10 to 3rd Qtr FY10. Candidate Evaluation (M&S) moved from 2nd Qtr FY10 to 3rd Qtr FY10. 1857: Not Applicable. 2311: Acquisition Milestone Changes: FROM TO REASON a. WASP 1.2.3 IOC 2Q FY10 3Q FY10 Program rebaselining b. WASP AV-8B 4Q FY10 Deleted FY09-FY10 funding shortfall c. WASP 1.2.4 IOC 3Q FY10 Deleted Capabilities merged into WASP 3.0 1.1.2.3 TRR is now grey (completed) as the TRR was held in Dec 09. 2.3.0 TRR/TIRB/FQT were deleted as now 3.0 has been split into two phases: Phase I will conclude at CDR in March of 2010, Phase II will start in 2011. This project had to be split because of contract issues. 3.1.2.4 was added to be a interim release while a new contract is processed for the 3.0 Phase II effort. All milestones were added. 4.3.1 & 3.2 projects had to slide due to contract constraints (new contract to be awarded in 2011). 5.3.3 & 3.4 projects were deleted because they no longer occur during FY10-FY15. We anticipate that they will reoccur after this time frame. 2312: Not Applicable. 9999: Not Applicable. FY11 from previous President's Budget is shown as zero because no FY11-15 data was presented in President's Budget 2010.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Air Platforms
  • Counter WMD
  • Cyber
  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Accuracy
  • Aircrafts
  • Business Administration
  • Collision Avoidance
  • Communication Systems
  • Contracts
  • Detectors
  • Ground Proximity Warning Systems
  • Maintenance
  • Procurement
  • Software Development
  • Tactical Communications
  • Tactical Networks
  • Terrain Awareness And Warning Systems
  • Test And Evaluation
  • Test Facilities
  • Warning Systems

Fields of Study

  • Engineering

Readers

  • Aerospace Test and Evaluation
  • Maritime and Naval Warfare Studies
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Microelectronics
  • Microelectronics - Microelectromechanical Systems
  • Space

Related Documents