Standards Development
Abstract
This project provides for the identification, study, design, development, demonstration, test, evaluation, and qualification of standard avionics capabilities for Navy use, and wherever practicable, use across all Services and Foreign Military Sales. Such air combat electronics developments include communications and airborne networking, navigation and sensors, flight avionics, safety systems, and flight mission information systems for both forward fit and retrofit aircraft. These efforts continue to maintain federated systems while encouraging transition of procurements to support a modular system for enhanced performance and affordability. Consideration is given up front to reduce acquisition costs through larger procurement quantities that satisfy multi-aircraft customer requirements and that reduce life cycle costs in the areas of reliability, maintainability, and training. This project also provides a Navy-wide program to develop required calibration standards (hardware) in all major measurement technology areas in support of Navy Hull, Mechanical and Electrical (HM&E) systems as well as Navy Weapons systems, ground and air, throughout the Fleet. It funds Navy lead-service responsibilities in the DOD and Joint Services Metrology Research and Development program. This project supports the military requirement to verify the performance of all test systems used to validate the operation of HM&E as well as Navy Weapon Systems with calibration standards traceable to the National Institute of Standards and Technology.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2012
- Source ID
- 0604215N_5_1319_PB_2012
- Change Summary Explanation
- Technical: Not applicable. Schedule: 0572: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) - P-8 Integration/Certification moved from 3Q10-2Q11 to 1Q11-3Q11 based on the P-8 Milestone C (MS C) moving from 2Q10 to 4Q10. Tactical Communication (TACCOM) - TACCOM Schedule adjusted for Issue 50076 POM12 Offset R&D 5% Overhead Reduction. Ground Proximity Warning System/Terrain Awareness Warning System (GPWS/TAWS) - MV-22 GPWS efforts were cancelled per OPNAV direction in 2010. MFOQA - Schedule changes reflect the rebaselined program. Program Management Review to Milestone Decision Authority occured on 20 May 10 and Acquisition Program Baseline signature will follow. COLLABORATIVE WARFARE (CW) - The Program Element (PE) was moved from N88 to N2/N6F in FY09 prior to program start. New direction was given to pursue Joint Capability Integration Development System activities and supporting experimentation/demonstration in lieu of the Collaborative Warfare process. In addition, in April 2010, the funding for FY12 through the PE end was marked and, thus, the efforts had to be re-scoped due to resource limitations. AvCIP - Program transferred from PE 0702239N, PU 3170. Schedule provided. CASP - FY11 collision avoidance requirements generation, initiation of design, integration, certification, and NSA IA activities. FY12 and out funding and activities transferred to CNS/ATM, GPWS/TAWS, Airborne Collision Avoidance System (ACAS), and ADDS to properly align budgets and requirements with new and existing programmatic efforts. ADDS - FY12 new start resulting from realignment of CASP activities and initiation of new Acquisition Category program to develop and provide data management enabling H/W and S/W not covered by existing programs. TAWS activities realigned and moved to GPWS/TAWS program. 1857: Not Applicable. 2311: Acquisition Milestone Changes: Due to a delay in contract award from January 2010 to March 2010 WASP Version 1.2.4 was adjusted accordingly: V.1.2.4 Software Requirements Review (SRR) from 2Q FY10 to 3Q FY10, V.1.2.4 Preliminary Design Review (PDR) from 3Q FY10 to 4Q FY10, V.1.2.4 Critical Design Review (CDR) From 3Q to 4Q FY10, V.1.2.4 Test Readiness Review (TRR) from 1Q FY11 to 2Q FY11 Due to a change in contract vehicles the WASP program will be able to award the FY11 contract for Version 3.0 in the first quarter of FY11. The schedule has been realigned to reflect contract award and release dates of Version 3.0 and subsequent versions are adjusted accordingly to accommodate the earlier awards and adjustment of version releases and testing. WASP V3.0 Phase II Technical Information Review Board (TIRB) from 2Q FY13 to 4Q FY12, V3.0 Phase II Functional Qualification Test (FQT) from 2QFY13 to 4QFY12, V3.0; Phase II Test and Evaluation from 4QFY12-1QFY13 to 3QFY12-4QFY12; V3.0 Phase II Release Initial Operational Capability (IOC) from 3QFY13 to 2QFY13. WASP V3.1 SRR from 3Q FY13 to 3Q FY 12, V3.1 PDR, from 4Q FY13 to 4Q FY12, V3.1 CDR from 1QFY14 to 1QY13, V3.1 TRR from 3QFY14 to 3QFY13, P V3.1 TIRB from 2QFY15 to 4QFY13, V3.1 FQT from 2QFY15 to 4QFY13; V3.1 Phase II Test and Evaluation from 4QFY14-1QFY15 to 3QFY13-4QFY13; V3.1 IOC from 1QFY15 to 2QFY14. WASP V3.2 SRR from 4Q FY14 to 3QFY13, V3.2 PDR, from 1Q FY15 to 4Q FY13, V3.2 CDR from 2QFY15 to 1QY14, V3.2 TRR from 4QFY15 to 3QFY14, V3.2 TIRB added 4QFY14, V3.2 FQT added 4QFY14; V3.2 Test and Evaluation from 4QFY15 to 3QFY14-4QFY14; V3.2 IOC added 2QFY15. WASP V3.3 SRR added 3QFY14, V3.3 PDR, added 4Q FY14, V3.3 CDR added 1QFY15, V3.3 TRR added 3QFY15, V3.3 TIRB added 4QFY15, V3.3 FQT added 4QFY15; V3.3 Test and Evaluation added 3QFY15-4QFY15; V3.3 IOC added 2QFY16. WASP V3.4 SRR added 3QFY15, V3.4 PDR, added 4Q FY15, V3.4 CDR added 1QFY16, V3.4 TRR added 3QFY16, V3.4 TIRB added 4QFY16, V3.4 FQT added 4QFY16; V3.4 Test and Evaluation added 2QFY16-3QFY16. 2312: Not Applicable. 9999: Not Applicable.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: JT Service/NV Std Avionics CP/SB
- Child Accomplishment: Mission Computer/Mission Systems Upgrade (AMCD)
- Child Accomplishment: Integration/Certification of Developmental Aircraft (CNS/ATM)
- Child Accomplishment: Provide Support to Tri-Service/Joint Programs
- Child Accomplishment: Develop Evolutionary Communication Systems (TACCOM)
- Child Accomplishment: Develop Ground Terrain Warning Capability (GPWS/TAWS)
- Child Accomplishment: Develop MFOQA Capability
- Child Accomplishment: Collaborative Warfare (CW)
- Child Accomplishment: CASP
- Child Accomplishment: AvCIP
- Child Accomplishment: ADDS
- Child Cost Item: 814ac627a27920c6ce74209e9ff5677f
- Child Cost Item: f8893d0fd7da177fa570c00b9f2cb8e9
- Child Cost Item: f1326ed509af3cff34cfc345436dcd34
- Child Cost Item: ba710b648ac693385393d6b107be26cd
- Child Cost Item: 478ac491a81034ab74996bb31626cd65
- Child Cost Item: cb4910c7f789e6e1e73c83afa4b42d8d
- Child Cost Item: c4fb33de79a8d366df017b10dcca2de8
- Child Cost Item: 3055f2ff2c1a3ad0f5f3e966ace995b5
- Child Cost Item: 13ec2eae9cdc762792b1437240f45f51
- Child Cost Item: 0f854116eaff64b0d1bba085ca0234bd
- Child Cost Item: e31d6afcc8492a22a04ea98f91f97ddc
- Child Cost Item: d9f4438d4faeee2e4ea06123910f836d
- Child Cost Item: 5e3983937b51f5b74792d6bd4ac4208d
- Child Cost Item: 64462c6d6fc1ccd5c0da6b17b85dfa53
- Child Cost Item: 39eed72e9e7f6c4f320aa389895327ed
- Child Cost Item: 94dd51dd99ac571b998547ccdae477e8
- Child Cost Item: b77c4cac6c0c64e97e1ae33274623e2c
- Child Cost Item: 10d25bbd558c67c433fb366ba26e2bd8
- Child Cost Item: 8b7e20da325ad0954c5faf81eba9ac97
- Child Cost Item: b9533078de6dc4dc39b784adb47acac6
- Child Cost Item: ab50db6d49d1115863820e1ec0006563
- Child Cost Item: 123a51e4d7fdd677cbd13615bd5bdcee
- Child Cost Item: 38da1b94be1424f75d90a16445b30d03
- Child Cost Item: dbee581cfc9d75a7191197565f7e6b05
- Child Project: Calibration Standards
- Child Accomplishment: Calibration Standards
- Child Cost Item: 1c20375d984cf9fcaf6a5ce767fdcec3
- Child Cost Item: 4633b7018e4aa9a18660fd50eb8da0b7
- Child Cost Item: d2fae03eb70af0853bfdffab35039710
- Child Cost Item: 40d4c12e86c45f51a78d35c1f3bfb5c9
- Child Cost Item: af9390cf2543c9613526c9d911358dda
- Child Project: Stores Planning and Weaponeering Module
- Child Accomplishment: Product Development
- Child Accomplishment: Test and Evaluation (T&E)
- Child Accomplishment: Program Management/Systems Engineering
- Child Cost Item: e5d95b5c716cf95623b2e03ea390d359
- Child Cost Item: 60c29481a7d65fd22131fcf08886d698
- Child Cost Item: ffe4efcff10fea50dce1ac088e2a286c
- Child Cost Item: 8b327c05572da531efc34fd096085d95
- Child Cost Item: d32d337b176e72fca6884b7e14a37621
- Child Cost Item: 668c5e2d3d4cd9b243c061258de5ef11
- Child Cost Item: 4deb0ee5a6c87d61b986facde9bf51d5
- Child Cost Item: 7224a333eb7c4ab1feb0a83eb236f7c2
- Child Cost Item: 7aea6613de75610b26937a70c9eb2c52
- Child Cost Item: 2cca37c0a44734b519f46fd373d8751e
- Child Cost Item: 93ccc1e7f322aec69aeac43f95590a91
- Child Cost Item: 7c78f1418769261509558fa26342b0fe
- Child Cost Item: c561a920b4a32f81867b4a004711f912
- Child Cost Item: 1f200ecb272dae99b17fa4d8bc3580ed
- Child Cost Item: 80383e708e5189c9637a0f43723843e1
- Child Cost Item: 17062b44a9afe20d3536ec0206fcca0e
- Child Cost Item: 6b53a68a98eebb6874617489429a1a9a
- Child Project: Common Helicopters
- Child Accomplishment: Common Helicopters
- Child Project: Congressional Adds