Standards Development

Abstract

This project provides for the identification, study, design, development, demonstration, test, evaluation, and qualification of standard avionics capabilities for Navy use, and wherever practicable, use across all Services and Foreign Military Sales. Such air combat electronics developments include communications and airborne networking, navigation and sensors, flight avionics, safety systems, and flight mission information systems for both forward fit and retrofit aircraft. These efforts continue to maintain federated systems while encouraging transition of procurements to support a modular system for enhanced performance and affordability. Consideration is given up front to reduce acquisition costs through larger procurement quantities that satisfy multi-aircraft customer requirements and that reduce life cycle costs in the areas of reliability, maintainability, and training. This project also provides a Navy-wide program to develop required calibration standards (hardware) in all major measurement technology areas in support of Navy Hull, Mechanical and Electrical (HM&E) systems as well as Navy Weapons systems, ground and air, throughout the Fleet. It funds Navy lead-service responsibilities in the DOD and Joint Services Metrology Research and Development program. This project supports the military requirement to verify the performance of all test systems used to validate the operation of HM&E as well as Navy Weapon Systems with calibration standards traceable to the National Institute of Standards and Technology.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2013
Source ID
0604215N_5_1319_PB_2013
Change Summary Explanation
Technical: Not applicable. Schedule: 0572: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) - P-8 Integration extended into 1Q FY12 due to increased platform requirements of 8.33 kHz and Mode S functionalities. The start of MH-53 ADS-B DT/OT moved from 1Q FY12 to 1Q FY13 due to engineering analysis delays. Ground Proximity Warning System/Terrain Awareness Warning System (GPWS/TAWS) - H-1 GPWS IOC moved from 3Q FY11 to 2Q FY13, H-60 TAWS IOC removed, H-1 DT moved from 1Q FY11 to 4Q FY12, and H-1 OT moved from 2Q FY11 to 1Q FY13 due to platform SCS schedule slip and non-availability of aircraft to support test. Added H-60 Obstacles MSB, MSC, and moved H-60 SW development from 1Q FY12 to 3Q FY12 due to re-designation of H-60 Obstacles from ECP to ACAT IV T Program. Changed H-60 TAWS Obstacles DT to H-60 TAWS Obstacles IT&E and moved start date to 4Q FY15 and deleted H-60 TAWS Obstacles OT due to platform test approach. Military Flight Operational Quality Assurance (MFOQA) - Schedule changes due to the inclusion of additional requirements. MSC is now 3Q FY12 vice 1Q FY12. Collaborative Warfare (CW) - NEXT CBA efforts extended from 1Q FY11 to 4Q FY11 due to execution and review of NEXT CBA products. Collision Avoidance Safety Program (CASP) - Removed NSA IA efforts from CASP schedule and realigned in ADDS schedule for development contract award. Advanced Digital Data Set (ADDS) - Schedule updated to align with lead platform schedule. MSB is now 3Q FY12 vice 1Q FY12. Avionics Component Improvement Program (AvCIP) cancelled by Issue #50388 POM 13 ENDGAME OFSET. 1857: Not Applicable. 2311: Acquisition Milestone Changes: Due to funding constraints, Weaponeering and Stores Planning (WASP) V3.2 development was delayed resulting in a push of V3.3 and V3.4. WASP V3.2, V3.3 and V3.4 were adjusted accordingly: V3.2 Software Requirements Review (SRR) from 3QFY13 to 3QFY14, V3.2 Preliminary Design Review (PDR) from 4QFY13 to 3QFY14, V3.2 Technical Information Review Board (TIRB) moved from 4QFY14 to 4QFY15, V3.2 Functional Qualification Test (FQT) moved from 4QFY14 to 4QFY15. WASP V3.2 Inital Operational Capability (IOC) moved from 2QFY15 to 2QFY16. V3.3 Software Requirements Review (SRR) from 3QFY14 to 1QFY16, V3.3 Preliminary Design Review (PDR) from 4QFY14 to 1QFY16, V3.3 Critical Design Review (CDR) from 1QFY15 to 2QFY16, V3.3 Test Readiness Review (TRR) from 3QFY15 to 4QFY16, V3.3 Technical Information Review Board (TIRB) moved from 4QFY15 to 2QFY17, V3.3 Functional Qualification Test (FQT) moved from 4QFY15 to 2QFY17, WASP V3.3 Test and Evaluation moved from 3QFY15-4QFY15 to 4QFY16-2QFY17. WASP V3.3 Inital Operational Capability (IOC) moved from 3QFY16 to 3QFY17. V3.4 Software Requirements Review (SRR) moved from 3QFY15 to 3QFY17, V3.4 Preliminary Design Review (PDR) moved from 4QFY15 to 4QFY17, V3.4 Critical Design Review (CDR) moved from 1QFY16 to 4QFY17, V3.4 Technical Information Review Board (TIRB) and V3.3 Functional Qualification Test (FQT) moved outside the FYDP. 2312: Not Applicable. 9999: Not Applicable.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Air Platforms
  • Cyber
  • Ground and Sea Platforms
  • Human Systems
  • Materials and Manufacturing Processes
  • Weapons Technologies

DTIC Thesaurus Topics

  • Airborne Collision Avoidance Systems
  • Collision Avoidance
  • Collision Avoidance Systems
  • Contracts
  • Detectors
  • Digital Data
  • Ground Proximity Warning Systems
  • Maintenance
  • Safety
  • Sense And Avoid Systems
  • Systems Engineering
  • Tactical Communications
  • Tactical Networks
  • Terrain Awareness And Warning Systems
  • Test And Evaluation
  • Warfare
  • Warning Systems

Fields of Study

  • Engineering

Readers

  • Aerospace Engineering
  • Aerospace Test and Evaluation
  • Maritime and Naval Warfare Studies

Technology Areas

  • Microelectronics
  • Microelectronics - Microelectromechanical Systems
  • Space

Related Documents