P-3 Modernization Program
Abstract
Fatigue Life Management Program is required to manage P-3/EP-3 inventory fatigue life and includes ongoing structural analysis, analyzing emergent structural issues, conducting engineering studies, assessing Fleet impact, and applying new technologies such as Non-Destructive Inspection techniques. This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2023
- Source ID
- 0604221N_5_1319_PB_2023
- Change Summary Explanation
- FY 2023 funding request was reduced by $0.224 million to account for the availability of prior year execution balances. Technical: Not applicable. Schedule: Not applicable. --- FY 2023 funding increase reflects the fact that the FY 2022 President’s Budget request did not include out-year funding.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Fatigue Life Mgmt Program
- Child Accomplishment: P-3/EP-3 Fatigue Life Management
- Child Cost Item: 0b882207d4c826461ace08434b467dab
- Child Cost Item: f626c9e0eebfef1d1946980fbc561154
- Child Cost Item: 6d35951d4e772d7e58fa52968e4dbb4a
- Child Cost Item: e7407f3df5daf7f1ce4b917297fd345a
- Child Cost Item: d2d2ae55ab81ab7aff0c3316c17de47f