P-3 Modernization Program
Abstract
Fatigue Life Management Program was required to manage P-3/EP-3 inventory fatigue life and included ongoing structural analysis, analyzing emergent structural issues, conducting engineering studies, assessing Fleet impact, and applying new technologies such as Non-Destructive Inspection techniques. This program was funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it included those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2025
- Source ID
- 0604221N_5_1319_PB_2025
- Change Summary Explanation
- Cost: Not applicable. Technical: Not applicable. Schedule: Not applicable.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Fatigue Life Mgmt Program
- Child Accomplishment: P-3/EP-3 Fatigue Life Management
- Child Cost Item: a9d55d297dc0db5985d569fdc195d28a
- Child Cost Item: ea6e0bf1295b803a323e828709503097
- Child Cost Item: 71b6f2a01deb61a10738aa3e3ac0000d
- Child Cost Item: 1fe76d7b9d6f1a5a1ed8c9ed967da5e7
- Child Cost Item: a959e147cafb0dc34cd9b4c8b1fb4c72