Target Systems Development
Abstract
This program element funds the development and procurement of aerial targets, sea surface targets, control systems, and associated Target Augmentation and Auxiliary Systems needed to represent real world threat systems. These capabilities are key enablers to the successful execution of the developmental and operational test and evaluation of naval combat weapons systems and to the satisfaction of advanced fleet training requirements. This program is funded under Research, Development, Test, and Evaluation Management Support because it supports efforts directed toward sustaining or modernizing installations or operations required for general research, development, test and evaluation.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2014
- Source ID
- 0604258N_6_1319_PB_2014
- Change Summary Explanation
- The Subsonic Aerial Target (SSAT) (designated the BQM-177A) program required additional funding in FY 2014 to meet revised program cost estimates for the addition of (Classified) requirements for an Increment 2. The Multi-Stage Supersonic Target (MSST) (designated the GQM-173A) program increased in design/development costs, requiring additional funding in FY 2012 to align to the Contractor's Estimate to Complete (EAC) and prevent delays in the initial production schedule. The reprogramming transactions were compiled from the midyear sweep and internal realignments. The GQM-173A encountered test failures and as a result Milestone (MS) C is now planned for FY 2015. Funds in the amount of $28.987 million have been shifted from WPN (BLI 22800) in FY 2014 to continue EMD in order to complete all tests satisfactorily. Air Superiority Target (AST) program: For FY 2012 the Navy share was reduced from the planned amount and shifted to FY 2013 because work on the Pre-EMD contract was delayed by water flooding a Boeing subcontractor. For FY 2013, increased budget covers efforts on the Boeing EMD contract and also the acquisition of 3 QF-16 targets. FY 2014 will not include costs for EMD contract efforts. QF-4 Full Scale Aerial Target (FSAT): The expenses of this effort are a function of the number of sorties/target-presentations combined with the quantity of aircraft on the ramp at Tyndall and Holloman Air Force Bases requiring calendar maintenance.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Aerial Target System Dev
- Child Accomplishment: Supersonic Targets
- Child Accomplishment: Subsonic Targets
- Child Accomplishment: Target Control and Target Augmentation and Auxiliary Systems
- Child Project: Wpn Sys T&E Trng Dev/Proc
- Child Accomplishment: Air Superiority Target (AST)
- Child Accomplishment: QF-4 FSAT
- Child Project: Surface Targets Development
- Child Accomplishment: Surface Targets Development
- Child Project: ASW TARGET
- Child Accomplishment: ASW Target Development