Acoustic Search Sensors
Abstract
Includes RDT&E funds for engineering development and operational test and evaluation of acoustic search sensors and complementary equipment for Anti Submarine Warfare (ASW) aircraft. Excludes civilian and military manpower and their related costs and military construction costs which are included in appropriate management and support elements in this program.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2012
- Source ID
- 0604261N_5_1319_PB_2012
- Change Summary Explanation
- Technical: Not applicable. Schedule: Not applicable. H0480. Multi-Static Active Coherent (Schedule 1). Updated Engineering Developmental Model (EDM) delivery to reflect a schedule bar from 2Q/10 thru 2Q/11 due to the fact that the contract delivery schedule provides for delivery over a one year period. H0480. Multi-Static Active Coherent (Schedule 2). Moved Advanced Processing Build (APB)(2) Fleet Release from 1Q/11 to 1Q/12, APB(2) S/W Release from 4Q/10 to 4Q/11, APB(2) Software Qualification Test (SQT) from 2Q/10 to 2Q/11 due to a one year Platform Hardware Procurement delay. Continuous System Development effort added from 1Q/10 thru 4Q/16 to show prior development test and subsequent Fleet release. Due to the various funding reductions we have received for OSD12, moved APB (2) Fleet Release from 1Q/12 to 1Q/13. H3224. High Altitude ASW. HAASW is a FY10 new start program. The preliminary findings of the Effectiveness and suitability, the first phase of the Analysis of Alternatives, have led to a maturation of the acquisition strategy. As part of the maturing acquisition approach, several components are integrated together and the acquisition milestones were adjusted accordingly. Deleted "Dropsonde and MPT" from schedule. Dropsonde will be included with GPS and Digitial Uplink to form the "HAASW" program. Due to the new requirements of the DODINST 5000.02, dtd Dec 2008, an Material Development Decision (MDD) and Milestone (MS)-A were added to the acquisition plan. MS-A was added in 4Q/10. Moved MS-B from 3Q/10 to 1Q/12 in order to accomplish the necessary acquisition processes and Technology Development phase. Moved Dropsonde MS-C from 4Q/14 and GPS/Digital Uplink from 2Q/14 to 1Q/14 due to program maturity which has allowed better planning accuracy. Moved Dropsonde FRP from 4Q/14 to 2Q/15 in order to account for required testing. Added PDR in 3Q/11 and CDR in 2Q/12 for completeness of schedule. Removed OA from 2Q/13. Moved GPS/Uplink Sonobuoy Mod contract from 3Q/10 to 1Q/11 to properly align it occurring after MS-A approval. Combined GPS/Uplink Sonobuoy Mod Production contract awards from 3Q/14 into the LRIP award in 1Q/14. "Integrated testing" includes all required testing during FY12 and FY13. Added IOT&E to 4Q/14 thru 1Q/15 due to it being a required test period and was added for completeness. Moved Dropsonde LRIP from 2Q/13 to 1Q/14 as LRIP must occur after MS-C. Current estimates are that LRIP systems will begin delivery in 4Q/14, therefore, moved LRIP delivery from 4Q/15 to 4Q/14. Moved FY11 buoy delivery from 3Q/11 to 4Q/11. Moved FY12 buoy delivery from 2Q/12 to 3Q/12. Moved FY13 buoy delivery from 1Q/13 to 2Q/13. Buoy deliveries are updated to reflect the new schedule driven by 5000.02 requirements and greater planning accuracy. Dropsonde LRIP 2Q/13 and Dropsonde FRP 4Q/14 are replaced with LRIP award 1Q/14.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: ASW Sensors & Proc
- Child Accomplishment: Complete Advanced Processing Builds (APB) SQT/Fleet Release
- Child Accomplishment: Multi-static Active Coherent (MAC) Increment I
- Child Accomplishment: Comms at Speed and Depth/At-Sea Test support
- Child Cost Item: 31aec84e6330261afbd61fbb5fae5f95
- Child Cost Item: f2234af5e6d96b95233980482abb4601
- Child Cost Item: 036c37b71b2b0348d4caa4dd691bbf2d
- Child Cost Item: 25016ec70bc211ffa3138bfcfe972095
- Child Cost Item: 40b10ebe0da8c0a7d4c6f955e4db6122
- Child Cost Item: 1dbeb8cdac4dcd64084ddf97d5efe504
- Child Cost Item: 2d13cc09b37bc3fd1197bcb032344ce5
- Child Cost Item: 2bd755cf835343c37eaffe25b76388fc
- Child Cost Item: cef5d1eff318669a8b148be3370d176e
- Child Cost Item: 24076867e5816807ae166d3979f8ac18
- Child Cost Item: afac682f1a0907de9b1f6b90afc40761
- Child Cost Item: 7e6d8fce7839b58b31fd85ddf69e29f4
- Child Cost Item: 6416bdad150a4d3b149d2f37bcd60b65
- Child Project: High Altitude ASW
- Child Accomplishment: Provide precision delivery of sonobuoys
- Child Cost Item: 8ba799a6a9b3747e561a4fc68fd598a8
- Child Cost Item: e04fdcc13cbe2dc8c3dee9629b6094bf
- Child Cost Item: a7e25a672b4fedd3b6276a44301a1bc5
- Child Cost Item: a46f0004ff481a5ff449712205af108f
- Child Cost Item: a8a9de9c816cdc5db6f27176f5e796c4
- Child Cost Item: 517e500a9972f5b53878358c52bda352
- Child Cost Item: b41e161bb90b114a2b0afef16b719267
- Child Cost Item: 8fb8db2ca7b22bcd91e4f82d323edadd
- Child Cost Item: 8e1d61c16bf19d1e8c984873cb7e1278
- Child Cost Item: f33fa2de0e859e299583b74010e47334
- Child Cost Item: b7bdcd48a10d60d5220b78189774fe6c
- Child Cost Item: bce3b774b3fd4e27d6396a21272c3cc4