Acoustic Search Sensors
Abstract
Includes RDT&E funds for engineering development and operational test and evaluation of acoustic search sensors/systems and complementary equipment for Anti-Submarine Warfare (ASW) aircraft. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2015
- Source ID
- 0604261N_5_1319_PB_2015
- Change Summary Explanation
- Technical: Not applicable. Schedule: 0480 Schedule 1. Due to the unavailability of test assests (sub services) and delays associated with DOT&E oversight, the Milestone, the Software delivery, the FOT&E period & the contract awards slipped accordingly. 0480 Schedule 2. Due to test asset availability, APB(2) Fleet software release slipped accordingly. APB(4) & APB(5) were deleted & RCI(2) inserted to reflect change from P-3 to P-8 platform. 3224. HAASW Sonobuoy and Software Integration schedules have been adjusted to align with the P8-A schedule. A prioritized GPS Drop Vector Algorithm (GDVA) is aligned with the Increment 2 ECP 3 High Altitude ASW Weapons Capability (HAAWC) FY17 IOC. Digital Telemetry has been deferred to P-8A Increment 3 (FY18 start). Due to the $2.265M rephasing in FY15, the ECP2 Integrated Testing period & the P-8A FOT&E period has been extended through 4Q/15 & 3Q/16 accordingly.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: ASW Sensors & Proc
- Child Accomplishment: APB System Qualification Test/Fleet Release for P-3C. Rapid Capability Insertion (RCI)/Fleet Release for P-8A
- Child Accomplishment: Multi-static Active Coherent (MAC)
- Child Project: High Altitude ASW
- Child Accomplishment: Provide precision delivery of sonobuoys