EA-18 Squadrons

Abstract

The EA-18G is replacing the EA-6B aircraft. The EA-18G's electronic attack upgrades the EA-6B Airborne Electronic Attack (AEA) capability to detect, identify, locate and suppress hostile emitters.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2013
Source ID
0604269N_5_1319_PB_2013
Change Summary Explanation
Technical: Not applicable. Schedule: Operational Testing for Integrated Broadcast Service scheduled to begin in 4th quarter 2011 is not required since effort has shifted to APN-5. Jamming Techniques Optimization is added as a multi-program project to analyze, develop, and improve current and future jamming techniques and tactics and is an ongoing effort. The schedule for the EA-18G unique H10 software build has been added to reflect required efficiency upgrades to AEA systems.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Air Platforms
  • Electronic Warfare

DTIC Thesaurus Topics

  • Aircrafts
  • Airframes
  • Avionics
  • Contracts
  • Cost Analysis
  • Costs
  • Demonstrations
  • Electronic Warfare
  • Engineering
  • Fighter Aircraft
  • Logistics Support
  • Network Centric Warfare
  • Procurement
  • Software Development
  • Systems Engineering
  • Test And Evaluation
  • Vehicle Design

Readers

  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Microelectronics

Related Documents