Electronic Warfare (EW) Dev

Abstract

This element includes development of Electronic Warfare (EW) systems for the United States Navy (USN), United States Marine Corps (USMC), and United States Army tactical aircraft, USMC helicopters, surface combatants, data link vulnerability assessments, precision targeting, USN and USMC radio frequency jammers, and development and testing of electronic warfare devices for emerging threats and emergency contingencies.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2012
Source ID
0604270N_5_1319_PB_2012
Change Summary Explanation
Technical: Project Unit 0556 / EW COUNTER RESPONSE: Not Applicable Project Unit 1742 / EW TECHNICAL DEVELOPMENT & T&E: Not Applicable Project Unit 2175 / TACTICAL AIR ELECTRONIC WARFARE: Not Applicable Project Unit 2260 / SPECIFIC EMITTER ID: Not Applicable Project Unit 3327 / MAGTF EW Aviation Development: Not Applicable. Project Unit 9999 / CONGRESSIONAL ADD: Not Applicable Schedule: Project Unit 0556 / EW COUNTER RESPONSE: JATO Executive Steering Committee Reviews added to schedule for increased visibility. A shortage in availability of test aircraft resulted in ICAP III schedule delays. Test aircraft availability decreased from two to one aircraft during Block 4 testing causing delays to Block 4 and subsequent Block 5 and 6 Development Test/Operational Test (DT/OT). ICAP III Block 4 OT completion delayed from 2nd QTR 2010 to 4th QTR 2010. ICAP III Fleet Release moved from 3rd QTR 2010 to 4th QTR 2010. ICAP III Block 5 DT/OT completion delayed from 2nd QTR 2011 to 3rd QTR 2011. ICAP III Block 5 Fleet Release moved from 3rd QTR 2011 to 4th QTR 2011. ICAP III Block 6 Fleet Release moved from 2nd QTR 2013 to 3rd QTR 2013. ICAP III Block 7 DT/OT and Fleet Release added in 2014-2015. Project Unit 1742 / EW TECHNICAL DEVELOPMENT & T&E: Not Applicable Project Unit 2175 / TACTICAL AIR ELECTRONIC WARFARE: IDECM Block 2 (IB-2): Full Rate Production deliveries shown on schedule. IDECM Block 3 (IB-3): The IB-3 schedule has been changed to reflect the completion of DT Flight Test. The completion of OT Flight Test has been moved to 2nd Qtr FY 2011. IB-3 Milestone III and Initial Operational Capability (IOC) have been moved to 3rd Qtr FY 2011 IDECM Block 4 (IB-4): Not Applicable ALQ-214 Software Improvement: Initial Operational Capability (IOC) planned for 4th Qtr FY 2015. Test events and SW Dev efforts added to the schedule. Project Unit 2260 / SPECIFIC EMITTER ID: Not Applicable Project Unit 3327 / MAGTF EW Aviation Development: Not Applicable. Project Unit 9999 / CONGRESSIONAL ADD: Not Applicable
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Electronic Warfare
  • Ground and Sea Platforms
  • Materials and Manufacturing Processes
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Aircrafts
  • Contingency Operations (Military)
  • Cost Analysis
  • Countermeasures
  • Electronic Countermeasures
  • Electronic Warfare
  • Engineering
  • Information Operations
  • Information Warfare
  • Network Centric Warfare
  • Program Management
  • Systems Engineering
  • Test And Evaluation
  • Test Facilities
  • Unmanned Aerial Systems
  • Warfare

Readers

  • Aerospace Engineering
  • Irregular Warfare and Special Operations Cyberspace Operations against Adversarial Threats.

Technology Areas

  • Microelectronics

Related Documents