Abstract
This program element includes development of Electronic Warfare (EW) systems for the United States Navy (USN), United States Marine Corps (USMC), and United States Army tactical aircraft, USMC helicopters, surface combatants, data link vulnerability assessments, precision targeting, USN and USMC radio frequency jammers, and development and testing of electronic warfare devices for emerging threats and emergency contingencies. This element also includes development of Aircraft Survivability Equipment (ASE) and Electronic Warfare (EW)/countermeasures solutions for the USN, USMC and Coalition Aircraft to include studies and evaluations of current and future aircraft threats, modeling and simulation for improved countermeasure capabilities, and development and testing to address new and emerging threats. This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision. PE 0604279N and PE 0604376M consolidated to PE 0604270N beginning in FY 2017. Project Unit 2175 Tactical Air Electronic Warfare Cost to Complete should read $82.128 Million. Total Cost should read $875.077 Million.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2019
- Source ID
- 0604270N_5_1319_PB_2019
- Change Summary Explanation
- Cost: Not Applicable. Project Unit 3309 / Assault Survivability Optimization: 0.140M reprogrammed from PE 0604272N PU 3304 to determine applicability of 1x1x8 countermeasures flares on Navy aircraft. Technical: Not Applicable. Schedule: Project Unit 0556 / EW COUNTER RESPONSE: N/A Project Unit 1742 / EW Technical Development and T&E: N/A Project Unit 2175 / Tactical Air Electronic Warfare: Acquisition Milestones: ALQ-214 SW Improvement Initial Operational Capability (IOC) was changed to a Fleet Release. ALQ-214 Adaptive Radar Countermeasures (ARC) Contract Award was added in the 2nd Qtr. FY 2019. Dual Band Decoy (DBD) Contract Award was added in the 3rd Qtr. FY 2019. Systems Development: ALQ-214 ARC Development: ALQ-214 ARC Systems Requirements Review was added in 3rd Qtr. FY 2019. ALQ-214 ARC Preliminary Design Review was added in 1st Qtr. FY 2020. ALQ-214 ARC Critical Design Review was added in 2nd Qtr. FY 2020. ALQ-214 ARC Build 1 was added in 3rd Qtr. FY 2020. AlQ-214 ARC Build 2 was added in 1st Qtr. FY 2021. ALQ-214 ARC Build 3 was added in 3rd Qtr. FY 2021. ALQ-214 ARC Build 3.1 was added in 1st Qtr. 2022. ALQ-214 ARC Build 4 was added in 2nd Qtr. FY 2022. DBD Development: DBD Development from 3rd Qtr. FY 2019 through 4th Qtr. FY 2024 was added. DBD Systems Requirements Review was added in 4th Qtr. FY 2019. DBD Preliminary Design Review was added in 2nd Qtr. FY 2020. DBD Critical Design Review was added in 4th Qtr. FY 2020. Test and Evaluation: ALQ-214 SW Improvement Testing: SWIP Developmental Testing/Integrated Testing DT/IT completion changed from 2nd Qtr. FY 2017 to 3rd Qtr. FY 2018 due to delays in software maturation and progression. ALQ-214 SW Improvement Integrated Test(IT)/Follow-on Test & Evaluation (FOT&E) was removed due to lack of closed-loop threat resources for test. ALQ-214 ARC Testing: ARC Developmental Testing from 4th Qtr. 2020 through 4th Qtr. 2021 was added. ARC Integrated Testing from 1st Qtr. 2022 through 3rd Qtr. 2022 was added. ARC Operational Testing from 1st Qtr. 2023 through 2nd Qtr. 2023 was added. DBD Developmental Testing from 4th Qtr. FY 2021 through 2nd Qtr. FY 2022 was added. DBD Integrated Testing from 3rd Qtr. FY 2022 through 2nd Qtr. FY 2023 was added. DBD Operational Testing from 3rd Qtr. FY 2023 through 4th Qtr. FY 2024 was added. Production Milestones: DBD Low Rate Initial Production was added in 2nd Qtr. FY 2022. Project Unit 3308 / Technology Development: Milestones: Software Release 17 removed due to zero funding received in FY 2017. Contract Awards: Operational Flight Program (OFP) added in 2nd Qtr. FY 2018 with additional awards in the 2nd Qtr. of each year continuing through 2nd Qtr. 2023. Target Generator added in 2nd Qtr. FY 2018 and 2nd Qtr. FY 2019. Systems Development: Systems Development Reviews: FY 2017 Review removed due to zero funding received in FY 2017. System Development Analysis: FY-17 Analysis removed due to zero funding received in FY 2017. Threat Analysis/Technique Optimization added beginning in the 2nd Qtr. FY 2019 through 4th Qtr. FY 2019 and continuing from 2nd Qtr. through 4th Qtr. of each year through FY 2023. Software Development FY-17 SW/Technique Development removed due to zero funding received in FY 2017. Test and Evaluation: Integrated Evaluation: FY-17 Integrated Evaluation removed due to zero funding received in FY 2017. Threat Simulation and Test Assets: Digital Radio Frequency Memory (DFRM) Target Generator Development added in 2nd Qtr. FY 2018 through 3rd Qtr. FY 2019. DFRM Target Generator Integration and Testing added in 4th Qtr. FY 2019 through 4th Qtr. FY 2020. IDECM Model Development added in 1st Qtr. FY 2021 through 3rd Qtr. FY 2021. FY-22 IDECM Model Lab Integration added in 1st Qtr. FY 2022 through 3rd Qtr. FY 2022 and 1st Qtr. FY 2023 through 3rd Qtr. FY 2023. Project Unit 3309 / Assault Survivability Optimization: FY 2017 flight test changed from 2nd/3rd Qtr to 3rd/4th Qtr due to aircraft and test range availability. FY17 Test MDF changed from 2nd Qtr to 3rd Qtr to align with flight test. FY 2018 flight test changed from 2nd/3rd Qtr to 4th Qtr due to test range availability. FY18 Test MDF changed from 2nd Qtr to 3rd Qtr to align with flight test. Added Radio Frequency Countermeasure (Chaff) fight test for MH-60 2nd Qtr 2018. Initiated modeling and simulation and engineering and evaluation to determine applicability of 1x1x8 countermeasures on Navy aircraft platforms. Project Unit 3327 / MAGTF EW Aviation Development: AN/ALQ-231(V)3 UH-1 Jettison Capability, Electronic Warfare Services Architecture, Marine Air Ground Tablet Integration with AN/ALQ-231(V), MAGTF EW Jammer Techniques Development, KC-130 Integration for AN/ALQ-231(V)1 Block 1 Communication Jammer, Electronic Warfare Range Improvements and Upgrades funding and schedules were removed in FY 2017 due to funding realignments. Unmanned Aircraft System Electronic Warfare Payload MS B moved from 1st Qtr. FY 2018 to 4th Qtr. FY 2018 and UAS EW Lot 1 award moved from 3rd Qtr. FY 2020 to 2nd Qtr. FY 2021 to align with updated schedule. UAS EW Lot 1 deliveries moved from beginning in 3rd Qtr. FY 2021 to 2nd Qtr. FY 2022. IOC moved from 3rd Qtr. FY 2021 to 2nd Qtr. FY 2022 to align with the updated delivery schedule. AN/ALQ-231(V)3 production and delivery lots updated to align with current production and delivery schedule, but total quantity remains the same. AN/ALQ-231(V)3 Production-Delivery Lot 9 updated from Qty 10 to Qty 9, Production-Delivery Lot 10 updated from Qty 10 to Qty 22, and Production-Delivery Lots 11 and 12 no longer required. AN/ALQ-231(V)1 BLK X production and delivery lots updated to align with current production and delivery schedule, but total quantity remains the same. AN/ALQ-231(V)1 BLK X Production-Delivery Lot 1 updated from Qty 1 to Qty 2, and Production-Delivery Lot 2 updated from Qty 4 to Qty 3. Project Unit 3371 / MAGTF EW Interoperability Development: SPIRAL 2 FIELD EVALUATION MV-22 extended from 4th Qtr 2017 to 4th Qtr 2019 due to delayed testing and updated schedule Project Units 3308, 3309, 3327, and 3371 were incorporated into PE 0604270N in PB17. PE 0604279N PU 3309 Prior Year amount is $21.566M. Project Unit 3327 / MAGTF EW Aviation Development: The FY 2019 funding request was reduced by $2.668 million to account for the availability of prior year execution balances. Project Unit 2175 Tactical Air Electronic Warfare: The FY 2019 funding request was reduced by $1.974 million to account for the availability of prior year execution balances. The FY 2019 funding request was reduced by $0.684 million to reflect the Department of Navy's effort to support the Office of Management and Budget directed reforms for Efficiency and Effectiveness that include a lean, accountable, more efficient government.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: EW Counter Response
- Child Accomplishment: JAMMER TECHNIQUES OPTIMIZATION (JATO)
- Child Accomplishment: ELECTRONIC WARFARE (EW) ADVANCED DEVELOPMENT
- Child Cost Item: 1be9b07c9d54bd2e4b756af84266c779
- Child Cost Item: 8ced2e9d46a6c9f8c204419136653186
- Child Cost Item: 4de94bbc130aad39a14acaf247b23d65
- Child Cost Item: 61a083335c88301d29de4b46f174bca1
- Child Cost Item: a3880c696fbbd0f32c730f8f73d3828d
- Child Cost Item: 4f6796431853fba1197cee64962af769
- Child Cost Item: 6e0ebebf60127333b0ad6d586a3cb382
- Child Cost Item: 810bd014bdfcf9caaaf9aca1b7069037
- Child Cost Item: 4c02e39c8a304bdb9ffadd1c822a1908
- Child Cost Item: fc38715c3dfbfa9d26e5b86f447a8c21
- Child Cost Item: fe7dfa3191bce59b515bef66a6b41577
- Child Cost Item: 80828f9178129fe9b476b21c19be612f
- Child Cost Item: a15be8fb2ebab027d7e622e3e78853a2
- Child Cost Item: 1549443cb1a94c5bb89321ca94e71da3
- Child Cost Item: 8ca0338b89823878a33a5871deb395d3
- Child Cost Item: a03448f982bfa5e821c1fa4546784a3e
- Child Project: EW Technical Development and T&E
- Child Accomplishment: Electronic Warfare Technical Development Studies and Test & Evaluation
- Child Cost Item: b56d189364f6d63b23307035366fca8b
- Child Cost Item: 654a545077667bd75a9a87e4466819c6
- Child Project: Tactical Air Electronic Warfare
- Child Accomplishment: Tactical Air EW
- Child Cost Item: 92f2a40d29bf0999e26f5a6665ed228a
- Child Cost Item: a30a1d13ac5ba146e2de03184a2c31ed
- Child Cost Item: 1e67ea8db3139e6eb916617b6a7c1c7a
- Child Cost Item: d64b58a1245f66d56c4f3163b7b062cb
- Child Cost Item: df8aeb3533895787c8b29303300e5b8d
- Child Cost Item: 027c20c85de845d1093c4cc90326955c
- Child Cost Item: 1624b00b3e7f5909a819c62868488109
- Child Cost Item: f8b26f97622b8826d625b0e6108e7ed2
- Child Cost Item: b3098049b8652be7933340f68321abee
- Child Cost Item: e13157cf6e31b7be85c221f92a412b46
- Child Cost Item: 4abf24706cdd4b33a35204f52e2c7d83
- Child Cost Item: f5bc3fe933576469af08e1cd6e1d8465
- Child Cost Item: 32808517729cf1625cd23123c5c57ff8
- Child Cost Item: ccde60db6125eeebb88b7747b377e19c
- Child Cost Item: 23a454eb14dc0670a804bfc4569cb2f3
- Child Cost Item: 0951ae7dc94b9b736ccdbc30c53d3b44
- Child Cost Item: d0cfa8264d00e8cecf511789d3a1ee91
- Child Cost Item: aeac4cd72c7fca4cb3f962b06c3faba9
- Child Cost Item: 1cff19408e32395c0faecf7b94c60dab
- Child Cost Item: 5d6f8dfe0f60cd1259ae22901924107d
- Child Cost Item: 3407e60fb3a4b2cf57adebc369e44afc
- Child Cost Item: a384c81fa48db0b5a670c29e99a0ada3
- Child Cost Item: 885fcace95f6bd22cc9612f229cbdd22
- Child Cost Item: f22702e228ed30254715c0c92658e122
- Child Cost Item: 7cdf058ca77fcb0d42b62923dfe73d05
- Child Cost Item: 5472b3ab7b39e932b625c0c2f7b50c4c
- Child Cost Item: c16a29f9aa0bc4d1016e91fdeb549c92
- Child Cost Item: 66d949f278ea41868d19ef408b0fbe3e
- Child Cost Item: bc66fd9178017e7cb418a8b39ada62d7
- Child Cost Item: f8ef58e9ed2717b28431958b2ab66453
- Child Cost Item: ae2b8753a0a98a9db92cadccdcab47cc
- Child Cost Item: 79e4a49535ad590131f6a65a4337e419
- Child Cost Item: 74a994c17eb9dfb6a2c852dddeb6bee9
- Child Project: Technology Development
- Child Accomplishment: Technology Development
- Child Cost Item: b295d54f0e0f6b8f152e632cbcfae7de
- Child Cost Item: fd57ebb36ca80af881ff518d7b2ae9d1
- Child Cost Item: ce9bfd045e21ad7ace607ead787fdd01
- Child Cost Item: a35b1e284b7801471570932cc42ee464
- Child Cost Item: 6a658978a483d34e3fac86e42b7935bb
- Child Project: Assault Survivability Optimization
- Child Accomplishment: Assault Survivability Optimization
- Child Cost Item: 4cafeb6d0e403306ed9449d2ac347a3d
- Child Cost Item: ca65cb105b938c9bb4f8eb88e05f18a8
- Child Cost Item: e2ab458bffce13b5a535e11cdc179f44
- Child Cost Item: fb5a3f5c1cb401f97593d7355c7f6e27
- Child Cost Item: c1d223468df0e235246aaaba4ede4d18
- Child Cost Item: 4aad3df315483488036dd6c0b230435d
- Child Cost Item: 403f7fe8ffd4bdc6a943ebd83b8d9d93
- Child Cost Item: 3b1d7531ac76d6134ab892ce9d7949c3
- Child Cost Item: 30382631bc0f5254fa530d6612076369
- Child Cost Item: 9f4da822cc9ced361d99b9be54e3932a
- Child Cost Item: 2a4b549bd3a50d19823251fd627ea729
- Child Cost Item: 102a054e0047fd53b008b5744b626d2c
- Child Cost Item: 19a5bd3ee6212675b94b645ba47934e6
- Child Project: MAGTF EW Aviation Development
- Child Accomplishment: Intrepid Tiger II (AN/ALQ-231)
- Child Accomplishment: Unmanned Aircraft System (UAS) Electronic Warfare (EW) Payload
- Child Accomplishment: MAGTF EW Jammer Techniques Development
- Child Cost Item: 47fb23265ffbb872da776c867657679f
- Child Cost Item: 5a33502413afd50485241958f37ccb3c
- Child Cost Item: 00db3b77a056e1826312b6c5abc2704a
- Child Cost Item: b2c975582b1a24a2edce1d8ab6658798
- Child Cost Item: 3236b409faa86b95bab12eb8cd889562
- Child Cost Item: e0e1c5f54b3bf8fcfb797b5b3048a649
- Child Cost Item: 4ebda1ba194856a8cc63d3ea244be4f4
- Child Cost Item: 29d69f9f085675573c65534678ff624a
- Child Cost Item: d8d5c0fb2ed4893afc2bacbd38662085
- Child Cost Item: bf6ab5d049c13762f2a659f96b9ac0be
- Child Cost Item: 2830a82fe1c0389a9d55cbf0b27e7034
- Child Cost Item: 97e8a4d84c297ef99e5c57d5c49b55bb
- Child Cost Item: e5ed4454b7c5a86c461acac110fa75cb
- Child Cost Item: 16412c75b13341d75c444944dac75612
- Child Cost Item: de6ff5f3b52efffe9614e28e685696a9
- Child Project: MAGTF EW Interoperability Development
- Child Accomplishment: Software Reprogrammable Payload
- Child Cost Item: 1c133690770cf212cf2a2c8a8f92efb6
- Child Cost Item: 7284b1253313e1b9878e57daab98f4ff
- Child Cost Item: 1fa793c71f2a1757459370fad73e6e5d
- Child Cost Item: 8e5317514eaa9181ef730d2fa9a2d741