Tact Air Dir Infrared CM (TADIRCM)

Abstract

NOTE: The cost to complete on exhibit R2 and R2a for project unit 3304 should be $162.174 million. R-3 exhibit reflects the correct cost to complete and total cost. This element includes development of electronic warfare systems for the United States Navy and United States Marine Corps assault aircraft. This includes the development and testing of advanced infrared countermeasures systems for emerging threats and emergency contingencies for Aircraft Self-Protection Equipement (ASE) suite integration. Realignment of project units from Tactical Aircraft Directed Infrared Countermeasures (TADIRCM) to JATAS began in FY11. Common infrared countermeasures was a new start for the Navy with efforts that began in FY13. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2016
Source ID
0604272N_4_1319_PB_2016
Change Summary Explanation
Schedule: PU 3302 JATAS: Engineering Development Model (EDM) changed from 1st Qtr FY14 to 3rd Qtr FY14. The project ends in FY14 in accordance with the Acquisition Decision Memorandum (ADM). Remaining funds in FY15 will be realigned to CIRCM (PU 3304). All tasks after FY14 were removed from the schedule profile. PU 3304 CIRCM: Changes made for Milestone B (MS-B) from 1st Qtr FY15 to 3rd Qtr FY15; Integrated Baseline Review Engineering Manufacturing Development (IBR EMD) from 2nd Qtr FY15 to 4th Qtr FY15; Critical Design Review (CDR) from 3rd Qtr FY15 to 1st Qtr FY16; Functional Configuration Audit (FCA) from 4th Qtr FY16 to 2nd Qtr FY17; Production Readiness Review (PRR) from 1st Qtr FY17 to 3rd Qtr FY17; Milestone C (MS-C) from 2nd Qtr FY17 to 4th Qtr FY17;Integrated Operational test & Evaluation (IOT&E) from 3rd Qtr FY17 through 4th Qtr FY18 to 4th Qtr FY18 through 4th Qtr FY19; Navy EMD Option from 2nd Qtr FY15 to 2nd Qtr FY16; Navy Development Test & Evaluation EMD (DT&E-EMD) from 2nd Qtr FY15 through 1st Qtr FY17 to 2nd Qtr FY16 through 2nd Qtr FY18; Navy Test Readiness Review (TRR) from 2nd Qtr FY16 to 2nd Qtr FY17; Navy EMD Test Articles from 1st Qtr FY16 to 2nd Qtr FY17. All tasks are on schedule and to be completed by the Army.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Advanced Electronics
  • Sensors
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Aircraft Equipment
  • Aircrafts
  • Attack Aircraft
  • Contractors
  • Contracts
  • Cost Analysis
  • Countermeasures
  • Directional Infrared Countermeasures
  • Electronic Countermeasures
  • Engineering
  • Fixed Wing Aircraft
  • Infrared Countermeasures
  • Tactical Aircraft
  • Test And Evaluation
  • Tilt Rotor Aircraft
  • United States

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Microelectronics

Related Documents