Tact Air Dir Infrared CM (TADIRCM)
Abstract
This element includes development of electronic warfare systems for the United States Navy (USN) and United States Marine Corps (USMC) assault aircraft. This includes the development and testing of advanced infrared countermeasures systems for emerging threats and emergency contingencies for Aircraft Survivability Equipment (ASE) suite integration. FY 2018 RDT&E overseas contingency operations (OCO) funding was required to finalize testing in support of fielding the federated DAIRCM JUONS system. FY 2019 RDT&E funding required to complete JUONS testing and to begin an integrated DAIRCM solution on MH-60S platforms via risk reduction efforts. The risk reduction efforts will modify Hardware (HW) and Software (SW) to the DAIRCM system as required to meet specifications. Program of Record will eventually support integration and retrofit of 300 USMC and 397 USN aircraft. FY 2020 RDT&E funding required for continued development of the DAIRCM system (HW and SW) and integrated DAIRCM solution on MH-60S platform. MH-60S is the focus platform in early development and for DAIRCM performance testing. The AH-1Z and UH-1Y, and MH-60R integration specific development will begin at the DAIRCM contractors following MH-60S integration and will focus on ensuring the required interfaces are captured and developed for integration testing to be conducted at a later time. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2020
- Source ID
- 0604272N_4_1319_PB_2020
- Change Summary Explanation
- The JUONS schedule delayed due to hardware(HW) and software(SW) issues identified during early DAIRCM testing and platform integration test. The schedule has also been driven by platform integration issues associated with multiple Enhanced GPS/INS units and software transferring/timing issues from older, slower processing chips to more advanced chipsets. Production start-up issues driving hardware deliveries. Hardware problems are solved and yield has improved significantly. -JUONS Fielding changed ending quarter from 2Q19 to 4Q21 -JUONS B kit integration added 2Q19-4Q21 -JUONS A Kit Development changed 1Q17-1Q23 to 1Q17-2Q19 -JUONS A Kit Installation Test Aircraft changed end date from 2Q18 to 2Q19 -JUONS TRR changed from 1Q18 to 3Q19 -JUONS Integrated Test 2 changed from 4Q18 to 2Q19-3Q19 -JUONS Live Fire Test 2 changed from 1Q19 to 4Q19 -JUONS Quick Reaction Assessment changed from 1Q19 to 3Q19 -JUONS Test Assets Deliveries begin 3Q18 -JUONS Hardware Deliveries changed from 1Q18-1Q19 to 1Q19-4Q22 DAIRCM EMD contract lagged due to delayed approval of Program of Record and refinement of the PoR Statement of Work and Specification. -DAIRCM SRR Changed from 3Q19 to 3Q20 -DAIRCM SFR added 3Q20 -DAIRCM PDR changed from 1Q20 to 4Q20 -DAIRCM CDD added 4Q18 to 3Q19 -DAIRCM CDR changed from 3Q20 to 3Q21 -DAIRCM Software Qualification Test was removed -DAIRCM B-Kit Integration & Test was removed -DAIRCM Operation Assessment added 4Q24 -DAIRCM EMD Contract Award changed from 3Q19 to 1Q20 -DAIRCM Risk Reduction Delivery Order added 1Q19 -DAIRCM LRIP added 2Q23
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: CIRCM
- Child Accomplishment: CIRCM Technology Development (TD)
- Child Cost Item: 3ef33d19108ecf273d9186b35aad6243
- Child Cost Item: 340b11011c44f9b6701d2f1f479b79fe
- Child Cost Item: 5c9fd05a83126d70cd822757ccfcc4a6
- Child Cost Item: 721e0bb921f65ffafc923570cb13e7e5
- Child Cost Item: 51e773e5776837a7fbac3c35dd02a3b3
- Child Cost Item: 529ebe665b6386079a6a486bd400e397
- Child Cost Item: c2f6eb1330927949c9c04a28534a96e6
- Child Project: DAIRCM Development
- Child Accomplishment: DAIRCM Development
- Child Cost Item: 235d2120adf851fa4cb0ae493f47c760
- Child Cost Item: c50a8c77f81ea1484c50d30b43886197
- Child Cost Item: 7fb82f4189dcfb6f68036a48c8ae5993
- Child Cost Item: c80fb6a7dcf5c047c0fa424a7b8b6cb2
- Child Cost Item: 08a883b163c7c771931e7ea698369bcb
- Child Cost Item: e91282c673e025970f35eb6c21261ffe
- Child Cost Item: eba9b82acbbba2d853956806b99db6ed
- Child Cost Item: a22e6ffad29d6c0014bbcfcc834a702f
- Child Cost Item: e223e47cc502b9550de0ad1abcb6304a
- Child Cost Item: 1c7f4221bfda26ab4f474db5c46a4c4f
- Child Cost Item: b51213b63fba37180bc7783826096a9b
- Child Cost Item: 88be7390abc35217c3d69f3cf4df5bf9
- Child Cost Item: ca49a5043ab46d808cf2e6c8a6a7c376
- Child Cost Item: 72fb63d13079d1fa40f7367716d8f4c2
- Child Cost Item: 0f751e6fa4a386b77ac2fa7574f383d3
- Child Cost Item: 2fa71ffdf118a6985eb52856740b03fc
- Child Cost Item: fccafd42c788b3e05397db2972d47120
- Child Cost Item: e23ec44fc31071e254ed1fdfe0458f6e
- Child Cost Item: 4cd7c75eb9ce5e468c7576b5d77092f4
- Child Cost Item: 1f35d65493a29b0c63ac1da76bc45c8c
- Child Cost Item: 63977af8b016465dd6fa95969c7b9031
- Child Cost Item: 1f04cf2912b8221dd3b16b2480bd8600
- Child Cost Item: 556a641d9e094b8969296c37dbaaec8e
- Child Cost Item: 7bf227f9f3ef8484b12de058fc8bf3a9
- Child Cost Item: eeea75296bdb919971ff4c3fb24cd63e
- Child Cost Item: a47c82312f6bd6a459c4b66bceb0c3a3
- Child Cost Item: 623e170be9688c8dd65676b48e34e5eb
- Child Cost Item: 254811a2bd3ab996b39f248e0d2f51f0
- Child Cost Item: 9b800a9909de76b001d7a17d5723830d
- Child Cost Item: 5f97346422e013f805bd166ac901cd1f
- Child Cost Item: 2126a68e034380ddedf79619c491feae
- Child Cost Item: b296dc6d960d9dc6cbac34a5184a9d77
- Child Cost Item: 0a9483206534b8cfd4eb162e41e21d4b
- Child Cost Item: a17313ff10ab4ffaca630149fa9d718a
- Child Cost Item: dc481b9b1d4d2a6f0a0ad6c3ed7eb446
- Child Cost Item: af04f87ea42767bcaddd91f0a5ae88e9