Tact Air Dir Infrared CM (TADIRCM)
Abstract
This element includes development of electronic warfare systems for the United States Navy (USN) and United States Marine Corps (USMC) assault aircraft. This includes the development and testing of advanced infrared countermeasures systems for emerging threats and emergency contingencies for Aircraft Survivability Equipment (ASE) suite integration. This program develops integrated hardware/software solutions that link on-board integrated Aircraft Survivability Equipment (iASE) with platform mission planning/information systems. IASE includes Infrared (IR), Hostile Fire Indication, and Laser Warning Sensors as well as Countermeasures Dispensing Systems (CMDS) and expendables. This program also adopts future multi-band, networking capabilities to facilitate real-time transfer of threat information, and off-board queuing and control of onboard sensors. DAIRCM studies and evaluates current and future aircraft threats, makes modeling and simulation for improved countermeasure capabilities, develops, tests and provides test equipment to address new and emerging threats. DAIRCM develops improved aircraft survivability of Department of Navy (DoN) assault aircraft in complex terrain for worldwide deployment. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2021
- Source ID
- 0604272N_4_1319_PB_2021
- Change Summary Explanation
- FY 2019 RDT&E funding completed JUONS testing and begin risk reduction efforts to incorporate lessons learned from the JUONs. FY 2020 RDT&E to correct Joint Urgent Operational Need Statement (JUONS) testing deficiencies and award DAIRCM primary HW Development. FY 2020 RDT&E Risk Reduction continues until Engineering & Manufacturing Development contract award (Changed 1QFY20 to 3QFY20). UH-1Y is the focus platform for initial development through Critical Design Review, leveraging risk reduction efforts to support integrating the system under glass. Concurrently developing interface controls and integration plans for platforms AH-1Z, MH-60S, and MH-60R to speed platform integration and test. Summary of changes: -DAIRCM Capability Development Document (CDD) extended to Q1 FY24 to align with entrance at acquisition post Milestone B (MS B); CDD finalized prior to MS C (1Q2024) -DAIRCM MSC Decision updated from 2Q2023 to 3Q2024 due to delay in completion of JUONS and align with DAIRCM Engineering Manufacturing and Development (EMD) Contract Award (3Q2020) The below schedule updates due to delay in completion of JUONS and align with DAIRCM EMD Contract Award: -DAIRCM SRR 2 changed from 2Q2020-3Q2020 to 1Q2021-1Q2021 -DAIRCM SFR changed from 3Q2020-3Q2020 to 2Q2021-2Q2021 -DAIRCM PDR changed from 4Q2020-4Q2020 to 3Q2021-3Q2021 -DAIRCM CDR changed from 3Q2021-3Q2021 to 2Q2022-2Q2022 -DAIRCM H1 Integration Testing changed from 1Q2022-4Q2022 to 3Q2023-4Q2023 -Added DAIRCM Development Test 1Q2023-3Q2024 -DAIRCM TRR changed from 1Q2023-1Q2023 to 3Q2023-3Q2023 -DAIRCM Integrated Test & Evaluation changed from 1Q2023-4Q2024 to 3Q2023-1Q2025 -DAIRCM Operation Assessment changed from 4Q2024-4Q2024 to 2Q2025-2Q2025 -DAIRCM LRIP 1 Contract Award changed from 2Q2023-2Q2023 to 3Q2024-3Q2024 -Changed DAIRCM Risk Reduction Delivery Orders from Production Milestones to Systems Development and updates End to reflect second delivery order awarded in December 2019: changed 1Q2019-1Q2020 to 1Q2019-1Q2021. -Changed DAIRCM Engineering Manufacturing and Development (EMD) Contract Award from Production Milestones to Systems Development and updated award date from 1Q2020-1Q2020 to 3Q2020-3Q2020. -Added Engineering Development Model (EDM) and Production Representative Model (PRM) deliveries to schedule details.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: DAIRCM Development
- Child Accomplishment: DAIRCM Development
- Child Cost Item: bb905e3386169960696feb54c2a9ac48
- Child Cost Item: 45423c998821a6d48e78ea46e6af2e36
- Child Cost Item: 92214c08ac02954abd2bfb613d96a1d6
- Child Cost Item: e59e3cc2370842706568254263614aec
- Child Cost Item: d9035b4eba44e59c3fcc71fcac82066b
- Child Cost Item: 5a8cf749267dc1e4fda27373edd5833a
- Child Cost Item: 0ff88b8aaae64a175406019f3f607d95
- Child Cost Item: 9f802af4f5e3041d8ed7c729fad0ebfe
- Child Cost Item: ab1b5236a1dfc12d8cd9cba59908ead1
- Child Cost Item: 05f6e972b6c6e36968edfdc6419211f9
- Child Cost Item: f8750fc7f85970d9af87ef4a0a35c2ab
- Child Cost Item: 99e038e2446975500e8652faa2a6435b
- Child Cost Item: 638c7c7afeb425336b41c7f8689d0599
- Child Cost Item: d73f4f087e7af93a428637820bd90eb2
- Child Cost Item: 983fa028791144df7d0b2e910f64dc99
- Child Cost Item: 004ea87238f6cdc0047d6a3eb1341320
- Child Cost Item: d5802d073b7640ef5b4d1eed3c41e306
- Child Cost Item: c91b3af664cf5b25fec5450a6ca9b16c
- Child Cost Item: 083a4d110b8aa65932f35ca184a30e8c
- Child Cost Item: 7bc45111c8b6d603b8554cadd8e2ebb9
- Child Cost Item: e32f593d89af6a3660acc2c165a8e8d8
- Child Cost Item: 7a5648b78b361e3611d17cab55b3b5e3
- Child Cost Item: 8f78c20ff2db78df5e80fd95acf00fd6
- Child Cost Item: c991ded13119635468b56e071438f84f
- Child Cost Item: f8c7d64d801b719b530a20cdb45160a6
- Child Cost Item: edc2e5f7fb32b7d8874dce8c6b7f636b
- Child Cost Item: 2ba6d65da644defe870ac6139cb418dc
- Child Cost Item: a42c55d5c7da8c6c761429df460300e1
- Child Cost Item: adf53ed8c288e58c2bae842757e0add4
- Child Cost Item: 6c0e3ee266d8549e66fc21a38b721502
- Child Cost Item: de68b4109503940d15ace7d3ee713380
- Child Cost Item: 270f80bc670da8afc74c51ba21b2b7ca